In this episode of the Pipeliners Podcast, regular guest Keith Coyle of Babst Calland discusses the recent GPAC meeting focusing on regulatory rulemaking for the LDAR (Leak Detection and Repair) rule.
The episode covers the structure and purpose of the GPAC, previous meetings’ outcomes, key topics discussed such as gas gathering lines, large volume release reporting, LNG facilities, hydrogen pipelines, and compliance deadlines.
Keith also recounts discussions and voting outcomes on each topic, providing insights into the regulatory process and its implications for industry compliance.
GPAC on LDAR and Class Location Show Notes, Links, and Insider Terms
- Keith Coyle is a shareholder and attorney with the law firm of Babst Calland. Mr. Coyle is a member of the firm’s Washington, D.C. office and a Shareholder in the Pipeline and HazMat Safety practice. Connect with Keith Coyle on LinkedIn.
- Babst Calland’s Energy and Natural Resources attorneys work collaboratively across legal disciplines to serve the needs of energy companies across the United States. Based in Washington, D.C., the Firm’s Pipeline and Hazardous Materials Safety practice represents clients on all types of pipeline safety and hazardous materials transportation matters.
- PHMSA (Pipeline and Hazardous Materials Safety Administration) is responsible for providing pipeline safety oversight through regulatory rule-making, NTSB recommendations, and other important functions to protect people and the environment through the safe transportation of energy and other hazardous materials.
- The National Pipeline Mapping System (NPMS) contains data on the locations of gas transmission, hazardous liquid pipelines, and LNG plants that are under federal jurisdiction.
- Leak Detection and Repair (LDAR) is the process by which oil and gas, chemical, and/or petrochemical equipment is monitored for the location and volume of unintended leaks
- Gas Hazardous Leak according to PHMSA is any release of gas from a pipeline that is uncontrolled, that could be an existing probable or future hazard to a person’s property or the environment, or that is or can be discovered using equipment sites, sound, smell, or touch.
- LPAC (Liquid Pipeline Advisory Committee) and GPAC (Gas Pipeline Advisory Committee) are statutorily mandated advisory committees that advise PHMSA on proposed gas pipeline and hazardous liquid pipeline safety standards, respectively, and their associated risk assessments. The committees consist of 15 members with membership evenly divided among Federal and State governments, the regulated industry, and the general public. The committees advise PHMSA on the technical feasibility, reasonableness, cost-effectiveness, and practicability of each proposed pipeline safety standard.
- Notice of Proposed Rulemaking (NPRM) is a stage in the rulemaking process that happens before an agency adopts a final regulation. It is like the first draft of a regulation and gives the public an idea of what is to come.
- Protecting Our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2020 addresses pipeline safety and infrastructure with respect to natural gas and hazardous liquid pipelines. It authorizes appropriations through FY2023 for specified pipeline safety programs under the Pipeline Safety Improvement Act of 2002 and related enactments.
- NTSB (National Transportation Safety Board) is a U.S. government agency responsible for the safety of the nation’s major transportation systems: Aviation, Highway, Marine, Railroad, and Pipeline. The entity investigates incidents and accidents involving transportation and also makes recommendations for safety improvements.
- Natural Gas Pipeline Safety Act of 1968 (Pipeline Safety Act) was authorized by the Secretary of Transportation to prescribe safety standards for the transportation of natural and other gas by pipeline, and for other purposes.
- Downstream means the direction and area the product is traveling toward. It can also mean the process involved in converting oil and gas into the finished product, including refining crude oil into gasoline, natural gas liquids, diesel, and a variety of other energy sources. The closer an oil and gas company is to the process of providing consumers with petroleum products, the further downstream the company is said to be.
- Gathering Lines are pipelines that transport natural gas from production facilities to a transmission line or distribution main lines.
- Type A: Pipelines that operate at relatively higher stress levels and are located in locations that have more than 10 buildings intended for human occupancy or locations where buildings with four or more stories above ground are prevalent.
- Type B: lines operating at lower pressures/stress levels than Type A lines in class 2, 3, or 4 areas.
- Type C: gas gathering lines in Class 1 locations that have an outer diameter of 8.625 inches or greater and operate at an MAOP producing a hoop stress of 20% or more of SMYS, or if the pipeline is non-metallic or the stress level is unknown, operates above 125 pounds per square inch gauge.
- Liquefied Natural Gas (LNG) is natural gas that has been cooled to a liquid state (liquefied), at about -260° Fahrenheit, for shipping and storage. The volume of natural gas in its liquid state is about 600 times smaller than its volume in its gaseous state in a natural gas pipeline.
GPAC on LDAR and Class Location Full Episode Transcript
Russel Treat: Welcome to the “Pipeliners Podcast”, episode 334, sponsored by the American Petroleum Institute, driving safety, environmental protection, and sustainability across the natural gas and oil industry through world-class standards and safety programs.
Be sure and register for APIs 2024 Pipeline, Control Room, Cybernetics Conference and Expo, May 6th through the 8th at the Hyatt Regency in Salt Lake City, Utah. This is a valuable opportunity to expand your knowledge, collaborate, and network with more than 700 industry professionals, all working together to sustain transform and secure our essential energy needs across the globe. Find out more at api.org.
[background music]
Announcer: The Pipeliners Podcast, where professionals, bubba geeks, and industry insiders share their knowledge and experience about technology, projects, and pipeline operations. Now your host, Russel Treat.
Russel: Thanks for listening to The Pipeliners Podcast. I appreciate you taking the time, and to show that appreciation, we give away a customized Yeti tumbler to one listener every episode. This week, our winner is Derrick Willis with Carrollton Utilities.
Congratulations, Derrick. Your Yeti is on its way. To learn how you can win this prize, stick around to the end of the episode. This week we speak to Keith Coyle about the March 2024 GPAC, addressing leak detection, repair, and class location. Keith, welcome back from Berlin, and welcome back to The Pipeliners Podcast.
Keith Coyle: Thanks, Russel. I had a very good trip to Berlin, Germany last week, and I actually live in Berlin, Maryland. I went from Berlin to Berlin, so in a lot of ways, I never left.
Russel: Sprechen Sie Deutsch? [laughs]
Keith: No, I did not speak German. I know Donker and I was continuing to say Donker even when I got back to the US, which was a little some strange looks. It was a great trip, and I really enjoyed it. I got to bring my dad along. We spend some time in and around the conference, and after the conference, seeing some sites and doing some cool things, so it was a really good trip.
Russel: For the listeners’ benefit, Keith was at the Pipeline Technology Conference in Berlin, which is a big event. I know a lot of people that go to that every year. I’ve never been to it, but it is on my bucket list of things I need to do. Maybe I’ll be able to get there next year.
Keith: I highly recommend it. It’s a great conference. It’s very well organized from people all over the world, fascinating presentations. It’s a great event.
A lot of people from PHMSA actually head over to the conference now as well. Tristan Brown was there, spoke on some topics, Alan Mayberry, Linda Daugherty. I saw some of the regional staff and some people from headquarters, so it’s really well-attended event, and it’s a good time.
Russel: There’s a lot of international interest in what we do in the United States, from a federal regulatory perspective, how we manage pipeline safety.
Keith: Yeah, I’m always surprised about the level of interest in US law, policy, technology, and then also getting to see all the cool things that are going on in other places around the world.
I was mentioning to you before we got on the show here about some very cool technology I saw in this new pipeline that they put it in Turkey that’s totally mind-blowing in terms of the level of advancement that they have on the technology over there. It was very cool.
Russel: Listen, I asked you to come back to talk about regulatory rulemaking once again. Here, it’s towards the end of April as we’re recording this. At about a month ago, we had the GPAC meeting, March 25th to 29th, in DC, looking at LDAR session two, would be the way I’d frame that.
I got sick, and I wasn’t able to make it to that event, so I asked you to come on and tell us what happened. Maybe give us a quick overview about what is GPAC and how it operates, and then we’ll dive into what was going on.
Keith: GPAC is a federal advisory committee. It’s comprised of 15 members that represent various stakeholder groups. There are five government representatives, five industry representatives, five representatives from the general public. The associate administrator for pipeline safety is the designated federal officer that oversees the GPAC.
The primary purpose of the GPAC is to review PHMSA’s proposed rulemakings in the supporting analysis and to provide recommendations for PHMSA’s consideration on those rulemakings.
Things, that by statute, it is required to consider those recommendations but not bound by them. If PHMSA decides to reject the GPAC recommendation, they’re required to provide an explanation in the record as to why they’re going in a different direction.
Russel: Let’s talk a little bit. We’ve done a couple episodes on this, but for people that may not have listened to that, maybe we should talk a little bit about what happened in the meeting at the end of November last year and how that impacted what was going on in the March meeting this year.
Keith: To back it up just a little bit, in May of 2023, PHMSA released a proposed rule dealing with leak detection and repair standards for gas pipelines as well as liquefied natural gas facilities.
PHMSA presented that proposed rule initially to the GPAC in a meeting that was held at the end of November, into December. The meeting went a full five days. The GPAC reviewed about half the rulemaking proposals when they wrapped things up in early December.
Then the most recent meeting that we had at the end of March was a continuation of the GPAC’s review of the LDAR rulemaking. Then, on the second half of the week, back in March, GPAC actually reviewed another rulemaking related to changes to PHMSA’s class location requirements for gas pipelines.
Russel: We ought to define for the listeners, Keith, what is the LDAR rule.
Keith: The LDAR rule is a rulemaking that PHMSA developed primarily in response to a statutory mandate that was included in the 2020 reauthorization of the Pipeline Safety Act.
That mandate directed PHMSA to issue new regulations for certain gas gathering lines, gas transmission lines, and gas distribution lines, dealing with new standards for detecting and repairing leaks on those types of pipeline facilities.
PHMSA, in developing that rule, they proposed standards for the pipeline categories that are covered under the mandate. Then they also proposed to extend those standards, outside of the mandate, to certain additional gas gathering lines as well as to liquefied natural gas facilities. There’s also a discussion of hydrogen pipelines, which we can talk about a little bit later in the show.
The primary driver for this rulemaking out of PHMSA was a mandate from Congress directing PHMSA to issue new leak detection and repair standards by the end…I believe it was December of 2021, was the deadline. We’re running late, but that’s the driver for the rule.
Russel: Just to do a quick high school political science review, every governmental agency has to be reauthorized. That’s a process where Congress reviews what they’re doing, how they’re performing against mandates that Congress has given them, and where they revise those Congressional mandates. That typically happens, for most agencies, about every three to five years.
Keith: There are some very limited circumstances where Congress will authorize a program in perpetuity, I guess until they pass another law repealing it. For the most part, Congress does generally authorize programs that federal agencies administer by statute for certain amounts of time.
That requires Congress to go back in on a periodic basis and reauthorize those programs and do two primary things in reauthorization. One, they set levels of funding for the program. Two, they’ll make other changes to the substantive statute to require the agency to do or not do certain things.
One of the things that was on PHMSA’s to-do list from the last reauthorization was this rulemaking for leak detection and repair.
Russel: Basically, Congress, in the reauthorization process, directed PHMSA to do something about leak detection and repair on certain kinds of gas pipelines.
Keith: Correct. They gave them a deadline for action. They specified criteria that the agency needed to consider in the rulemaking process.
Russel: The way that this works is the mechanics are PHMSA will provide background information. They’ll put forward proposed language. There’ll be discussion in the GPAC. Oftentimes, GPAC will revise that language and vote on that revised language. Kind of the way the process works.
What’s really important to industry is what were the votes. Not always, but in general, what’s in the voting slides is pretty much what lands in the rule.
Keith: In terms of the mechanics of how PHMSA does the GPAC, generally, on a big rulemaking like this, they will break things up into topics or specific regulatory provisions. They’ll group them.
Then PHMSA will have a presentation at the beginning of the discussion, where they will walk through what the proposal was on the topic. Then they will summarize the comments that they receive from the public. Then they will turn the discussion over to the committee itself. Then the committee will engage in its discussion and debate.
As they’re doing that, the committee is developing recommendations back to PHMSA on the specific topics that are under discussion at that time. It’s an iterative process. The GPAC deliberates, literally deliberates, in this public meeting.
They’re trying to come up with language that the GPAC can vote on to provide some sort of consensus recommendation back to the agency on things that they think the agency should be considering in the rulemaking process.
Everything the GPAC says, it’s a recommendation. It is an advisory body. It’s not a board of directors that runs PHMSA. It’s an advisory body. Everything that goes back to PHMSA really is just a recommendation.
PHMSA can decide to go in a different direction as long as they provide reasons for doing so, but I do think the GPAC recommendations have significant weight in the rulemaking process. That’s the mechanics of how it happens.
Russel: What was discussed? What were some of the key votes in this last GPAC meeting? Maybe we’ll start talking about gas gathering lines.
Keith: In the March meeting, there were a couple of topics, leftovers from the November/December meeting. The key topics were gas gathering lines, large volume release reporting, LNG facilities, hydrogen pipelines, and then compliance deadlines. The committee considered all of those big-bucket topics.
There were certain aspects of the proposed rule that the committee just didn’t really consider or weigh in on. Most of that stuff was pretty minor. The first thing that they considered at the outset of the meeting were the requirements for gas gathering lines. There was a lot of debate and discussion at the end of the November and December meeting about what to do with gas gathering lines.
Within the section 113 statutory mandate, there was a directive for PHMSA to include Type A gas gathering lines and Type B gas gathering lines within the scope of this new LDAR rule, but there was no express statutory directive to include the requirements for the new Type C gathering lines.
These Type C gathering lines are going to be gas gathering lines in Class 1 locations that meet certain diameter thresholds and that operate at certain pressures. These lines have historically not been subject to PHMSA’s regulations, but there was a rule that was issued back in November of 2021 that extended new reporting requirements and safety standards to these lines.
One of the big issues that was left over from the last GPAC meeting was what are we going to do in this LDAR rule with respect to these Type C lines.
Where the committee ultimately landed on the recommendation was to essentially extend the LDAR requirements to all of Type C lines but to break them up a little bit, to require annual leak detection surveys for the Type C lines that are currently required to have leak surveys done under the existing rule, the new rule that just came out.
There’s going to be Type C lines that are greater than 16 inches in diameter and then Type C lines that are 8 inches up to 16 inches that have a building intended for human occupancy or other impacted sites. That’s an annual leakage survey requirement and then compliance with all of the other leak detection program requirements that the committee considered back in November and December.
For all of the other Type C lines, what the committee recommended was a five-year leak survey requirement. That was basically how things shook out, an annual survey requirement for certain Type C lines and then a five-year leak survey requirement for the remainder.
Russel: I know there’s been a lot of conversation, for the gatherers, about the National Pipeline Mapping System and what the gatherers are going to have to provide to PHMSA to get their lines incorporated into the pipeline mapping system. Can you tell us a little bit about that conversation and how that landed?
Keith: That one, there was a divided vote on that proposal, of seven to seven. There was a split right down the middle. What PHMSA had proposed in the rule was to extend the National Pipeline Mapping System requirements to all regulated Type A, Type B, and Type C gas gathering lines.
There was a lot of significant debate and comment because there is a provision in the Pipeline Safety Act that authorizes the National Pipeline Mapping System. It’s in 49 U.S.C. 60132. In subsection A of that provision, there is an exception for gathering lines and distribution lines built into the statue.
Industry’s position is that, because of that exception in the statute, PHMSA does not have the legal authority to require gathering line operators or distribution line operators to provide information to the NPMS system, at least not until Congress changes the law.
PHMSA’s position coming into the meeting was that they could use other authorities in the Pipeline Safety Act to require gathering line operators to participate in the NPMS in any event. There was significant discussion amongst the GPAC members, one, about the legal issue.
Then two, setting aside the legal issue, what’s the utility or what’s the feasibility, practicability of requiring gathering line operators to provide NPMS data, given the fact that most of these lines have been largely unregulated for a long time?
Not all operators have the kind of geospatial data that you would need for the NPMS or the detailed level of additional information that is required for the National Pipeline Mapping System. At the end of that long discussion, there was an evenly divided vote, seven-seven. We’ll see where the agency goes with that.
Russel: I find that really interesting. This is one of those things I think is going to be contentious. We’ll see, but it’s unusual, at least in my experience for GPAC to…Generally, they reach consensus, and in this case, clearly, they did not.
Keith: Yeah. We had some other votes that were not necessarily split votes, but votes that were not unanimous, that were more of those in this meeting and maybe I’ve seen some of the past meetings.
The most interesting thing about this discussion was the statutory question, and I do think there were members of the committee that were at least uncomfortable talking about those issues or acknowledging that we’re not lawyers. We’re not judges. We can all read the statute and have our opinions and views.
Then, the second piece of it was, even if there is statutory authority, what’s the utility, what’s the feasibility of requiring, gathering line operators to provide this information? I think there was a line of discussion that was basically this was a tool that was originally developed, just for general public awareness about pipelines. There’s a cost benefit to that, obviously.
Another side of it was there’s interest amongst people who do research on pipelines, particularly, some of the folks involved in methane emissions and mapping. They would like to see gathering lines included in the NPMS data to assist them in the research that you’re doing.
I’m on the record, saying as much in the meeting, my personal opinion is that there is a statute that Congress enacted, it’s very specific, and it has a very specific exclusion in the statute. One of the ways our government works is Congress gets to write the laws, and Congress can change the laws if it chooses, but in my opinion, I think the statute is clear on this point.
Now, as you know, I’m often wrong and never in doubt, so we’ll see if that shakes out…
[crosstalk]
Russel: As all good attorneys are, right?
Keith: Yeah, right. This is one of those issues where we’ll just have to wait and see, because it was right down the middle.
Russel: Moving down the list here. Large volume release reporting, could you give us a definition of what that is, and then, where that landed?
Keith: PHMSA had included this metric. I’m going to get the number wrong, so I’ll reserve my right to explain it later. There was a quantity of gas released that PHMSA had put in the proposal rule.
It was a million-something, but there was discussion about whether that metric should be adjusted to align with certain new regulations that the Environmental Protection Agency has issued, dealing with methane emissions and reporting.
There was a desire to try to align whatever metric PHMSA uses for large volume release reporting to align with the comparable metric that EPA is using for its release reporting, and then there was a suggestion to make this reporting quarterly. Operators are required currently to report certain large releases of gas under the incident definition.
Now, the large volume release reporting would be a separate report and you would have to report volume that’s a little less than what’s currently required under the incident reporting definition. It’s basically designed to be a standalone report to notify the agency and the public when you have large volume gas releases that don’t result in an incident.
Russel: I would also clarify that not all large releases are incident-related. You could have a large release that’s related to blow down on a large pipeline required to do repairs.
Keith: That’s one of the things that this is trying to capture, intentional large volume releases associated with regular operation and maintenance work and stuff like that to get the agency some more data on methane emissions.
Russel: What about LNG facilities?
Keith: For LNG facilities, this was one of those things that PHMSA added on to this rulemaking which the mandate was focused on gas gathering, gas transmission, and gas distribution. PHMSA did propose to extend requirements to LNG facilities. Their LNG facilities are unique in PHMSA land. They have a dedicated set of rules that are in part 193.
The part 193 rules rely more heavily on an industry standard NFPA 59A than Part 192 does. The rules are a little skinnier. One of the things that PHMSA wanted to do here was to extend some version of a leak detection and repair program to LNG facilities.
Where the committee landed on that, there was a vote to consider whether PHMSA should exempt certain portions of LNG facilities that are going to be subject to EPA monitoring requirements from the leak survey provisions.
Then there were other things about considering what are the appropriate survey frequencies and the repair and leak detection criteria that should apply to these LNG facilities. There was just a general understanding that LNG facilities are different than pipeline facilities and just making sure that PHMSA that accounts for those differences in developing the final rule on a go-forward basis.
Russel: I’m going to display my ignorance here, Keith. You may know the answer to this.
Keith: I do that often.
Russel: Are LNG facilities regulated exclusively by PHMSA, or are they also regulated by OSHA like other kinds of petrochemical refineries, that sort of thing?
Keith: That is a harder question to answer. Here’s what I will tell you about LNG facilities. They are subject to regulation by PHMSA and by state authorities. There are requirements in Part 193. There is a applicability test that you need to use to figure out if you’re regulated. You have to be receiving gas from or delivering gas to a Part 192 regulated pipeline.
LNG facilities are subject to regulation for safety purposes. PHMSA also has siting requirements that apply to LNG facilities. That’s very unique. They don’t do siting for pipelines, but they do do siting for LNG facilities.
On your OSHA question, the reason that it’s more complicated than I give you a clean answer is that there’s something known as the reverse preemption provision in the statute that OSHA administers.
That basically says if another federal agency is exercising jurisdiction over something that deals with something that might otherwise be jurisdiction of OSHA, OSHA is displaced. There’s some complicated questions at LNG facilities as to what is a PHMSA-regulated activity versus what may or may not be subject to some OSHA oversight.
Russel: Oh, wow. That’s fascinating. I’m sorry. I’m about to take us down a rabbit hole, but we won’t go today.
Keith: No. I gave you literally an answer that was basically a long way of saying, “It depends.”
Russel: Right.
[crosstalk]
Russel: The interesting thing for me that I didn’t know is that if OSHA has governance and some other agency has governance, then OSHA steps away. The agency that has more…I’m not saying this very well. It’s interesting.
Keith: The reverse preemption or displacement of OSHA authority is an interesting topic. It’s been litigated quite a few times. There’s always discussion or debate about how far one agency’s jurisdiction actually reaches. Is it really displacing OSHA? Is it not? There’s always a reluctance among federal agencies to acknowledge limitations on jurisdiction. It’s an interesting question.
Russel: No doubt. I’m just looking at the note you sent me. Clearly, GPAC was in favor of exempting those portions of the LNG facilities that were subject to EPA monitoring. That vote went down 13-1. Certainly a lot of consensus in that conversation.
Keith: That was consistent. PHMSA had a similar exemption that they put in for compressor stations in this rule to try to avoid duplicative or overlapping regulation, where it’s possible, between the PHMSA rules and the EPA rules and also try to maintain consistency within the two regulatory approaches if you can think.
You don’t want to have one entirely different set of standards when you’re dealing with your PHMSA stuff and then something that’s totally misaligned when you’re dealing with your EPA requirements, like trying to line up the approaches and the philosophies and also trying to avoid overlapping jurisdiction.
Russel: Interesting. Let’s move on and talk about hydrogen.
Keith: Hydrogen was interesting. It was one of those ones where I didn’t expect the hydrogen discussion to last as long as it did. There’s a very limited hydrogen mileage in the US. I think it’s something like 1,500 miles of hydrogen pipelines right now.
The GPAC spent a lot of time discussing hydrogen pipelines. They talked about two things, basically, pure hydrogen pipelines, or dedicated hydrogen pipelines, and then pipelines that are used to blend some amount of hydrogen.
The vote for the pure or dedicated hydrogen pipelines, there was a segment of the GPAC that wanted those to be subject to these rules. They didn’t prevail. I think it was eight to five the other way. There was a majority but not a consensus, a majority that said we should have pure hydrogen pipelines be subject to the proposed regulations that PHMSA has on the table.
I actually think that’s the right answer because the rulemaking proposal that PHMSA developed was targeted to methane natural gas pipelines. The technologies they were looking at were targeted to methane natural gas pipelines, the standards that they were looking to apply.
I think trying to squeeze hydrogen pipelines into this rule, pure hydrogen, just because would have been a square peg in a round hole or pick your analogy.
On the blend, I think there was more of a willingness for blended pipelines to have the provisions in the rule apply. I think there was probably some discussion about how much hydrogen do you need to blend into a natural gas pipeline to make it relevant.
My understanding is that even if you’re blending a certain percentage of hydrogen into the natural gas pipeline, it’s still going to behave, in all relevant respects, like a natural gas pipeline for leak purposes. You should be able to use the same natural gas leak detection technologies on a hydrogen blend pipeline.
That’s one of those issues where I think PHMSA is going to have to do some additional studying and analysis to decide. I don’t know how much hydrogen blending is actually going on in the US, in the real world, right now. I know some folks are playing around…
[crosstalk]
Russel: There are a fair number of pilot projects occurring, but most of those blends are in the five percent hydrogen domain. The research that’s been done in terms of all the integrity management issues around hydrogen is that you don’t tend to have hydrogen embrittlement challenges with blended pipelines until the hydrogen begins to exceed 15 to 20 percent of the blend.
Most of what’s going on right now in pipelines that are being retrofitted to blend is very low-percentage hydrogen blends. There’s all kinds of other issues with hydrogen. I’ve done a number of podcasts on that. It makes sense to me because a blended pipeline, at least in terms of current state of the art, is 80 percent, typically greater, methane.
Keith: My understanding from talking to some other people is that at that quantity of natural gas, you should still be able to use natural gas leak detection and be perfectly fine and not necessarily get all caught up on are you detecting the methane as well. That’s where things landed on hydrogen.
Then the last thing that the committee talked about was compliance deadlines. This was a big topic of debate and concern. In the rulemaking world, we have a couple of dates that are impactful for compliance or legal purposes. The first is the publication date of the rule. That’s when the rule is put in the Federal Register so everybody can see the final version.
Then you’ll have an effective date of a rule. That is the date when the regulations that are included in the published rule actually have legal effect. You could go to the Code of Federal Regulations on the effective date. It will have changed. There will be new text there.
Then the third thing we care about are the compliance dates. That’s when does the operator need to come into compliance with the various provisions that were in the published final rule that went into effect. Generally, those dates are staggered. We try to give people significant amounts of time so that they can adjust their operations to come into compliance.
We don’t want all the rules to go into effect all at the same time on all the affected provisions and operator communities. That would be extremely difficult for everybody to swallow that all at once. What the committee recommended was some staggered what I’ll call compliance dates.
One thing that they recommended was, within 18 months of the effective date of the rule, they want people to have their programs developed or in place or at least be moving to get those provisions where you have to have new programs, get those in some kind of form.
Maybe not they’re ready for full implementation, but at least you’ve thought it through. You’ve got a document. You think you’re sort of ready to go. Then, after that, have a rule of thumb of 36 months from the publication date of the final rule to try to start having people come into compliance with some of the specific provisions.
Where PHMSA ends up with those dates, that’s hard to say. In some of the more recent rulemaking proposals, PHMSA has departed from GPAC recommendations on compliance dates. I think that’s going to be a challenge. They’re going to have to consider cost/benefit issues.
I think generally speaking, for sectors like gathering as opposed to transmission or distribution, hopefully they would get a longer compliance date on anything that’s included in the rule, just because they’re going from 0 to 60 on a lot of this stuff.
Whereas maybe the distribution operators and transmission operators are going from 55 to 60 or something like that. We’ll see. There are a lot of different provisions in this rule that may get different or unique compliance dates. There were changes all over 192. There’s a lot of different moving parts.
That’s where we landed on the LDAR rule. Where do we go from here? PHMSA has given people until April 29th to submit additional written comments on what happened at the GPAC meeting and just the rulemaking in general. There was a request to extend that deadline that was denied by the agency. That April 29th date, that’s hard and fast.
From there on out, it’s really up to PHMSA and other parts of the current administration to figure out what’s going to go in the final rule and the final cost/benefit analysis, getting that approved internally and over at the Office of Management and Budget and then getting something published in the Federal Register.
I know this is a high priority for the administration. We’ll see how fast they can get it done.
Russel: If I were setting up a pool, I wouldn’t have it done before the end of the year, but I could be wrong.
Keith: My general rule of thumb is to always bet the over on…
[crosstalk]
Russel: [laughs] Exactly.
Keith: Except when it comes to telling my clients when they need to come into compliance. I always tell them to bet the under because you can’t…
[crosstalk]
Russel: Exactly.
Keith: Most of the time, on rulemakings, I bet the over. Almost always right on that. It would be really hard to get all of this done before the election. We’ll see. Maybe sometime in 2025. I know, people I’ve talked to at PHMSA, they’re committing all the resources that they can to get this done as soon as possible.
Russel: Certainly, it’s a priority of the current administration. I want to talk about the class location rule. I know that was on the agenda back for the November/December GPAC and we didn’t get to it. I’m curious if they got to that during the March GPAC and what came out of those conversations.
Keith: They did get to the class location rule. They did finish all of that rule. They got it done. I think it was two and a half days, but they moved pretty quickly to get that done. That was good news. This is a rule that PHMSA proposed back in October of 2020. It was designed to modernize the class location requirements to deal with class location changes.
PHMSA has been issuing special permits for a number of years, where if your class location increases from, say, a class 1 to a class 3, there was a special permit process, there still is, where you can go as to get a waiver and to come into an alternative approach for classification instead of having to do a new pressure test or derate your pipeline or cut out the pipeline and replace it.
That’s what this role was about. It was about codifying the long-standing special permit approach for dealing with classification changes, putting that into the regulation, so that operators wouldn’t have to come get classification, special permits anymore, they could just follow the new regulation.
Russel: Awesome. Before we wrap this up, I want to talk a little bit for the listeners. I know there’s a lot of regulatory people that listen to this podcast. If they don’t know or if you’re a listener and you don’t know all of the information that Keith and I are talking about, it’s available on the PHMSA website. There’ll be a full transcript of all of the committee discussions if you’re so inclined to read it. There will also be a PowerPoint where they have the voting slides, so anywhere where they voted language, those will also be represented.
We’ll provide some links for all of that in the show notes, so that people can find that information if they’re looking for it. Sometimes, navigating the PHMSA website to find this stuff is non-trivial. [laughs]
Keith: They have a special page where they put the Advisory Committee-related materials. It’s a little bit off the beaten path. There’s a wealth of information up there if you want to see it.
Like Russel says, if you want to read a little GPAC transcript over the weekend, go for it. Have some fun. I’m not sure I would do it, my personal selling, but they have all their slides. You can get the committee vote recommendations. There’s a lot of stuff…
Russel: You’ll also have all the comments from people who had comments and so forth. There’s a wealth of information there that can help you understand all the background for the rulemaking.
Keith: We still have a few days to submit additional written comments on the LDAR rule. That’s going to go until April 29th. They did give an extension for written comments in the Class rule. That one’s not going to run until August. If you’re interested in the LDAR rule and you want to get something timely into the record, you still have a few days to do.
Russel: Keith, as always, you’re a wealth of information, always enjoy the conversation. If it weren’t for you, I wouldn’t have any idea what’s going on in the regulatory domain.
Keith: Right after this, you’re going to look up the OSHA reverse preemption provision, and you’re going to have that lined up and ready to go for the next podcast, [inaudible 39:34] using and all.
Russel: Yeah, sure. That’s…
[crosstalk]
Keith: [laughs] You’re like, “No, I’m not going to go, read OSHA and all of that. No, I’m not.”
Russel: I’ll let you read it, and you can tell me about it. How’s that?
Keith: No. I have a spoiler alert, don’t read it.
Russel: [laughs] I have enough of a challenge reading the stuff I need to read just through the PHMSA stuff. When I get off of that but I start getting into some of this more obscure stuff. it’s hard to maintain interest.
Keith: No, it’s all labor of love. Thank you again for having me on the show. This is always fun and entertaining. You always ask me something I’m totally unprepared for, hence the OSHA discussion, but it’s good because it keeps me on my toes, and it keeps me humble.
Russel: All these conversations are generally driven by my curiosity and the guests’ knowledge. I’m asking the questions that are coming up for me, so I apologize.
Keith: Sometimes the guests’ knowledge falls far short, but that’s OK.
Russel: You have a good one.
Keith: You too, buddy. Good talking to you.
Russel: I hope you enjoyed this week’s episode of The Pipeliners Podcast and our conversation with Keith. Just a reminder before you go, you should register to win our customized Pipeliners Podcast Yeti tumbler. Simply visit pipelinepodcastnetwork.com/win and enter yourself in the drawing.
If you’d like to support this podcast, please leave us a review on Apple Podcast, Google Play, Spotify, wherever you happen to listen. You can find instructions at pipelinepodcastnetwork.com.
[background music]
Russel: If you have ideas, questions, or topics you’d be interested in, please let me know, either on the Contact Us page at pipelinepodcastnetwork.com or reach out to me on LinkedIn. Thanks for listening. I’ll talk to you next week.