On this month’s episode of the Oil & Gas Measurement Podcast, David Wofford of Wofford Energy Consulting joins to discuss meter freezes in the hydrocarbon industry.
David shares insights from his extensive career in measurement and pipeline operations, highlighting the causes, impacts, and operational challenges posed by freezing conditions in pipelines and metering systems. The conversation also touches on the evolution of technology and strategies to address these issues effectively in the field.
Meter Freezes Show Notes, Links, and Insider Terms
- David Wofford is the owner of Wofford Energy Consulting. He is a seasoned consultant with over 40 years of expertise in fluid measurement, automation, controls, pipeline and facility operations, and systems integration. A long-time committee member of ISHM for nearly three decades, he has shared his knowledge through presentations and training at ISHM, ASGMT, ISA, GPA, and various other organizations. Connect with David on LinkedIn.
- Wofford Energy Consulting specializes in providing expert consulting, design, integration, and training services for oil and gas pipeline and facility operations, with over 40 years of experience in measurement, quality control, SCADA, regulatory compliance, and industry leadership.
- Hydrates or Pipeline Hydrates: Hydrates are white, solid, ice-like substances that form at elevated pressures and low temperatures because of an interaction between a liquid water phase and light natural light gas components. The water associated with hydrocarbon production might be in the form of vapor associated with natural gas. Hydrate formation is a major hazard in pipelines that carry wet gas.
- Meter Freeze is a generic term applied to several different conditions that negatively impacting natural gas measurement, control systems, and the gas flow within pipelines, when water ice and/or hydrates form ice or ice like blockages with the pipeline, metering equipment, and control system.
- Tap or Meter Freeze: When water ice or hydrates for within the measurement gauge lines, orifice meter tap holes, or within the transmitters. The gas measurement (and controls related to the gas volume measurement) are impacted, but gas continues to flow down the pipeline.
- Episode 3: Using Data Analytics to Drive Measurement Validation Rules with Michael Thompson
- Gas Chromatography (GC) is an analytical tool used to accurately determine the concentration and make-up of certain substances flowing through a sample. GC analysis can be used for petroleum, natural gas, fuels, LPG, petroleum refined products, petrochemicals, and additional hydrocarbons and chemicals.
- AGA (American Gas Association) represents companies delivering natural gas safely, reliably, and in an environmentally responsible way to help improve the quality of life for their customers every day. AGA’s mission is to provide clear value to its membership and serve as the indispensable, leading voice and facilitator on its behalf in promoting the safe, reliable, and efficient delivery of natural gas to homes and businesses across the nation.
- Orifice Plate is a type of primary flow measurement device that creates a measurable pressure drop across a known restriction.
- Differential Pressure (DP) flowmeters determine flow by measuring pressure drop over an obstacle inserted in the flow pathway. These flow devices are orifice plates, averaging pitot tubes, venturi tubes, and flow nozzles
- International School of Hydrocarbon Measurement (ISHM) provides instruction in both technical and non-technical measurement subjects for personnel in the industry. Problems that pertain to the measurement, control, and handling of both gaseous and liquid hydrocarbons are studied so that useful and accurate information can be developed and published for the benefit of the public.
- Measurement Analysts are back-office measurement employees who are responsible for reviewing and managing the incoming stream of raw measurement data, managing configurations within the measurement software system, and addressing issues identified within the data.
- Flow Computer An electronic device used in the oil and gas industry to measure and control the flow of hydrocarbons.
Meter Freezes Full Episode Transcript
Weldon Wright: Welcome to the Oil and Gas Measurement Podcast, episode 40, sponsored by Enersys Corporation, provider of Muddy Boots field operations software, assisting oil and gas operators to implement accurate and reliable measurement activities across their entire operation, while also simplifying data collection from the field. Find out more about Muddy Boots at enersyscorp.com/software/muddy-boots.
[background music]
Announcer: Welcome to the Oil and Gas Measurement podcast, where measurement professionals, Bubba geeks, and gurus share their knowledge, experience, and likely a tall tale or two on measurement topics for the oil and gas industry. And now your host, Weldon Wright.
Weldon: Hello, I’m your host Weldon Wright with FpvPrime Measurement Consulting. I’m here today with David Wilford of Wilford Energy Consulting.
We’re going to visit a little bit about meter freezes, which is kind of a timely thing because we’re sitting here with some snow on the ground in north Texas, which is pretty rare for us. David, welcome to the podcast. Tell us a little bit about yourself and what you do in the measurement industry.
David Rofford: Well, thank you, Weldon. It’s a pleasure to be here. I am now retired from the corporate world, having been in the industry for about 40 years. I do some independent consulting and training work and measurement controls and facility operations.
I actually started right out of high school while I was going to college. I’d worked summers on pipelines being one of the young pups doing the grunt work. Out of high school or out of college after I graduated college, I went to work for Transwestern Pipeline as a measurement technician and got into measurement and chromatography and all that good stuff.
Then through the years moved on as companies merged and sold and acquired and all that. I was in Tulsa for about 15 years with what used to be Transok, which is part of the Enable Group — Energy Transfer Group now — and then ended up in Houston with Tejas through an acquisition.
Then, following that, I got some diverse experience with Shell in the Gulf of Mexico for several years. I got good offshore experience in measurement and SCADA and controls and then moved on from there. After another acquisition, back in Oklahoma and Arkansas for several years, doing measurement and pipeline operations.
Then, ended up back in Houston for several midstream companies, and ended my career with Noble Midstream up to the point that they were acquired by Chevron. I took retirement, and now, I’m enjoying being one of those old codgers who’s a consultant and gray-headed of what hair I have left. [laughs]
Weldon: I like it. I’m in the same mode right now. I changed my LinkedIn profile recently to say, “Only fun projects should apply.”
David: Exactly.
Weldon: That’s one of the great things about being airpoint in the industry. We can be very selective about what we do.
David, this is timely, I know Russel Treat put us up to that. He suggested an episode for the podcast for meter freezes, and that’s probably been a month or two ago. We’ve been playing telephone tag and trying to find dates because, of course, our schedules are so busy, right?
David: Right.
Weldon: This is very timely. Like I said, as we sit here, I’m looking at a weather map, and I see, down here in Texas, we have 30s. We have high-20s up at the Panhandle, getting a little cold for us. We kind of dodged a bullet, wasn’t as cold as it could be, but we have temperatures all the way from 71 down in Miami. Those guys don’t get meter freezes down there.
David: [laughs]
Weldon: I see lower teens up in Montana and in North Dakota right now, so this is a thing that is timely for us. I’d like to talk a little bit, for the people down in Florida that don’t know what a meter freeze is, tell us a little bit about what meter freezes are and how they impact us.
David: Basically, meter freezes, and freezes, in general, are products in our sector of the business, in hydrocarbon business, of, first of all, the presence of water. The presence of water in and of itself is a operational issue in general. When it’s combined with hydrocarbons, and especially heavier hydrocarbons in large amounts, and under higher pressures, it becomes very prone to forming solids, which are referred to as hydrates, is what they call an inclusive compound.
That compound can actually form a solid. Slingy term for hydrates in the pipeline industry is soft ice. It can form those solids or freezers, at temperatures, when you’re under higher pressures well above the freeze point of water. You can form these solids and these freezers at temperatures in the 40s, and under extreme conditions, even higher than that sometimes.
It’s a real challenge, especially in metering and control equipment where you have a lot of smaller diameter tubing, or orifices, and systems with transmitters, manifolds, smaller metering valves, things like that, it can become a challenge.
Weldon: Now, in the production, the midstream gathering world water’s just a fact of life for us,
Right?
David: That’s right. That’s right.
Weldon: Once we get in the transportation pipeline, the distribution world or end users, we shouldn’t see water there, right?
David: That’s right.
Weldon: We should be virtually dry. Dry, tiny amounts of water can end up there and it doesn’t take much. When I first started this industry, my concept of meter freeze is where we froze up the entire meter tube, right?
David: Yeah.
Weldon: That’s really not the case. Most of the time we start off with freezes in our tubing. That tiny drop of water that’s in that tubing because we didn’t slope our tubing to our transmitter properly, that tiny drop of water sitting inside of that bowel freezes up, and now all of a sudden our differential pressures, our pressures have gone crazy, haven’t they?
David: That’s right. The rule of thumb for a meter freeze, just on an orifice meter, for example, was evidenced by a sudden rise and spike in your differential pressure.
Then it would, so to speak, just freeze at that high point wherever you ranged out on your transmitter or your old chart recorder or whatever. That was indicative of a meter freeze because you generally would freeze up initially on that high-pressure side.
As that freeze formed and then grew, it would raise the pressure on that high side and cause a unrepresentative indication of a high differential pressure that you had to more or less from a data processing standpoint, fix administratively based on best available data so you wouldn’t have some erroneous calculations of flow volumes.
Weldon: You bring up a good point. You said those old chart recorders. Let’s be real careful there. I’ve got a couple of friends in the industry still doing chart recorders.
David: Absolutely.
Weldon: Bruce Wallace and his company, they’re in the chart integration business. We think there’s 175,000 charts in custody transfer use still. A lot of those out there.
Back to the point. When we were in the chart recorder world, when somebody showed up at the first of every month or maybe every Monday, or once a week when we were in the chart recorder world, that meter freeze was easy to see on that chart, right?
David: That’s right.
Weldon: That tech was out there swapping old paper for new paper, put that new chart on there. He just whipped his pin out of his pocket and he’d circle that meter freeze.
When it went into the chart integrators, it was obvious to the chart integrator. Or in more modern days, as we’re doing it electronically, before they put that chart on the integrator, they looked at it and said, “Hey, we’ve got an area we have to fix.”
In today’s world of electronic flow computers, and we’ve been in that world a while.
David: Yeah.
Weldon: It makes me feel old when I talk about it sometimes.
David: [laughs]
Weldon: The midstream was the last adopters of that, and midstream has been electronic flow computers for what, since the early to mid-90s, right?
David: Oh, yeah.
Weldon: In today’s world of electronic data processing there’s got to be some more work done to discover those meter freezes. We have to have validation rules. We have to have people looking at data that’s been grafted by their system, right?
David: That’s right. Definitely, when we got away from, say those graphical representations as a rule on charts and moved into the digital world of just masses of data, it became a little more difficult to identify those things visually.
A lot of work has been done, and continues, on system diagnostics, utilizing data trending looking at relationships between variables and relationships within entire systems of multiple metering systems to identify anomalies and things like that, so you can determine when something is unrepresentative and then go in and make proper adjustments to give good representations of actual flow conditions.
Weldon: We could do probably multiple episodes on just what this means to the analyst in the back office. Just what they should look for, how they edit those. We’re on Episode 40 of this podcast right now, so time flies.
In one of my earliest episodes, I had Michael Thompson on the podcast with me. You all might want to go back and look at that. That could be…I don’t know what episode. One of the very early ones. In the single digits probably.
Michael has done a lot of great work in detecting meter freezes through data analytics. I’m not talking just, I’m looking for a high-pressure or low-pressure, but AI-type analysis. Folks may want to go back and look at that other episode.
In this episode, we wanted to talk about what’s happening in the field, how do we get there, and what we do.
David: Exactly.
Weldon: One of the things I’d like to talk a little bit about is we’ve talked about here a meter freeze can drive differential pressures up or an oddity is down sometimes, they can fix their static pressures. They do crazy things there.
I want to branch this off into two separate topics. I want to talk some more about hydrates in a few minutes. First of all, I would like to talk about things that are affected by freeze-ups inside of our meter tubes, inside of our gauge lines, and other equipment on site. What else is impacted by meter freezes or by freezing conditions in the pipeline, I should say?
David: Yeah, freezing conditions in general. Freezing hydrates and freezing conditions, in general, can cause havoc within your control systems, especially if you have to rely on utilizing a source gas for your control gases.
It’s very important to treat and dry those gases within your control systems here again because if you freeze those up, your controls can just go crazy on you. Even if you’re using instrument air systems, you’ll notice the instrument air systems have very thorough drying systems on them to keep the air dry and the water out.
Freezing can cause havoc on your control systems, which has a domino effect on your pressure control, your flow, control on process control, on safety…
[crosstalk]
Weldon: You can end up with a mess in a hurry.
David: That’s exactly right. In the metering world, specifically in order or orifice metering, through the years, we were used to those tap freezes that occurred. That was here again, the product of the presence of water and those liquids, those combined inclusive compounds of water and heavy hydrocarbons, a lot of time creeping along the walls of your meter and migrating into your pressure taps.
One of the facilitators of that were leaks in your gauge lines or in your connections. They would just facilitate that creeping of those compounds. When the conditions of pressure and temperature got just right, they could begin to form solids and cause you freezes.
As you said earlier, Weldon, you and I have seen through the years an entire meter tube frozen solid of hydrates from the accumulation of those liquids in the production and midstream areas where you’re pre-dehydrated, and you haven’t had the opportunity to remove those heavy hydrocarbons through processing can cause some problems.
Even in the pipelines, pipelines can freeze up solid. Large pipelines can freeze up solid due to the formation of these hydrates and as a product of these compounds under pressure and temperature.
That’s why, as a standard rule of thumb, of course, the threshold for the presence of water vapor onshore was seven pounds per million cubic foot was that threshold. Anything over seven pounds was considered wet and needed to be dried through dehydration.
My experience in the offshore world, we had even much tighter restrictions in that, maybe one or two pounds because we were operating at very, very high pressures ANSI 900 systems or greater. If you froze up a pipeline offshore, you have very limited options to resolve the problem. [laughs]
Basically, if you freeze up a pipeline, your solution is you have to start lowering the pressure so you can allow that hydrate that has formed within the pipeline to dissolve. That’s a big operational cost and a big impairment to your operations.
You take a lot of steps to try to avoid those situations. That’s why the use of products like methanol, for instance, are huge in the production in midstream sectors because it combines with those compounds to help lower the freeze point and keep those hydrates from forming.
Weldon: Once the hydrates have formed. Normally, you’ve got elevated pressure. You’ve got the presence of water, rich gas, heavy hydrocarbons. For some reason, little amounts of H2S make the process even more prominent.
I don’t know the science behind that, but I know once you get hydrates if you’re operating an 800, 900,000 pound or higher line and you freeze up with hydrates blocker line and drop the pressure, just because you dropped the pressure doesn’t mean the hydrates are going to come apart.
That structure becomes somewhat stable and you may have to take a line all the way down, almost atmospheric pressure sometimes. Then when it comes apart, it can be violent too.
David: That’s why, from an operational standpoint, resolving those issues through pressure reduction has to be done with great care. If you lower the pressure on one side of that hydrate, obviously, you have a higher pressure on the other side of that hydrate. That hydrate becomes like running a pig in a pipeline.
If it releases, if it deteriorates enough to release down that pipeline, you’ve got a big ice bullet coming down that pipeline at very high velocity that can be very, very detrimental both from a safety standpoint and an operational standpoint.
It has to be done with great care. You have to lower the pressure very slowly on both sides of the freezes, so you don’t create large differentials within your pipeline that can cause you bigger problems than the freeze itself.
Weldon: Absolutely. Some years ago, I was doing some work inside of a storage facility. Not a salt cavern like we’re used to down here in the south, but this was aquifer storage, so that gas comes out wet.
David: Absolutely.
Weldon: We were sitting there and they brought me in. We’d done some control system work. They brought me in for the startup of this facility for withdrawal. I had never been around this sort of thing before. By sort of thing, I mean the sound of those hydrates flying through the pipe.
As they started to withdraw about 30 to 40 minutes into it, you started to hear something coming down the pipe — hitting, bouncing, crashing — and I was horrified.
The operator said, “First of all, you need to know that the top of that wellhead, and all the pipe between here and our heat exchanger and our dehy units are all about four times the thickness they need to be.”
David: Yes. [laughs]
Weldon: That stuff goes on all the time. It sounded like there were boat wagons coming through that pipe. Big pressure differences, and, energy and pipelines, you got to be careful with that stuff.
David: That’s absolutely right. It becomes not only an annoyance, from a metering control standpoint, but it’s a very significant safety issue. It has to be managed with people who know what they’re doing, and with great care and diligence.
Weldon: Wrapping back around, though, a little bit to something you mentioned early on about temperatures. Folks need to be very aware that when we start talking meter freezes — freezes in pipelines, freezes in our meter equipment — we can have freezes that are not hydrates, that are just pure water in a transportation pipeline.
David: That’s right.
Weldon: We’ve got lean gas. Hopefully, there’s nothing else in there. We can freeze that up in cold enough weather, but you’ve got to be cognizant. As we change pressures in pipeline, different things happen. Just like, if you ever camped at high altitudes or if you’ve lived at high altitudes, your recipes for baking a cake, for boiling water, for cooking stuff change.
David: That’s right.
Weldon: If you get up at a high altitude, water boils at a lower temperature. Well, opposite things happen when you increase temperatures. Even with pure water, you don’t need to be below 32 degrees in a pipeline to potentially freeze up.
David: That’s right.
Weldon: Now, it’s not as radical as what it vapors at. When we add a little bit of heavy hydrocarbon, maybe a little bit of H2S to that gas, we have these problems at very warm temperatures, or relatively warm temperatures, I should say.
Be aware as you’re looking at problems in your measurement, your control systems, issues that seem intermittent that you don’t understand. If these are happening in cool weather, you should be aware. Also, even in warm weather, we got to get our buddy, Joel Thompson. We got to get him involved in the conversation.
David: [laughs] That’s right.
Weldon: If you’re taking big pressure cuts with just tiny amounts of water in there, you could be freezing up inside a line when you’re standing outside in 89-degree temperatures.
David: That’s exactly right. If you’re taking large pressure cuts, here again, with the right recipe of water and other constituents, especially that rule of thumb for Joule-Thomson effect, about one degree through 15 pounds of pressure drop, you’re taking significant pressure cuts, all of a sudden, you’re creating just the right recipe for creating a freeze condition in your systems.
Here again, that’s why a lot of steps are taken operationally, both chemically — using methanols and things like that — or even using direct heat applications, heat wrapping systems, or things like that.
Obviously, dehydration is one of the primary operational facets of pipeline operations, in both gathering and transmission, and certainly in processing.
Because if you’re in a refrigeration or cryogenic facility where you’re processing gas to recover hydrocarbons, the last thing you want to do is introduce water vapor at those cryogenic temperatures, because they will freeze up your systems in an instant and just totally shut down your facilities.
Weldon: Can’t agree more. Great information. Like I said, it’s timely as we look out the snow here in North Texas. Here in North Texas, South Texas, it’s a battle for us a few times a year. Maybe not on the hydrate side, but freezing up entire pipelines, freezing up wellheads, that’s a few times a year.
Looking up to our friends up in the Marcellus especially, the formations producing up in Colorado and in the Utah, those guys battle cold weather a major portion of the year. Then the Bakken folks, I don’t even want to think about that. I get cold just saying that word.
David: [laughs]
Weldon: Those people are in a world where this is more than half the year…
David: That’s right.
Weldon: …they’re battling these concerns.
David: It’s just a normal operational issue that you have to deal with.
My wife and I have a place up here in Oklahoma, and I’m sitting here right now as we speak, and there’s about six inches of snow on the ground. The temperature at night has been down in the mid-teens. Not unusual weather for this part of the country. Then, as you move, like you say, in those farther north environments, it gets even more extreme.
It’s a common operational issue that operators generally build into their operational models to have to deal with to keep their systems open, because the reliance of the source for providing gas to the LDCs and to the transmission system, so they’re moving large quantities of gas into, for instance, power plants, industrial facilities, or shipping it across the country, begins at that production in midstream standpoints.
There’s a lot of upstream work that happens to condition that gas to provide it to those systems, so they can be given to the end users in a good, clean state. It’s a common issue that’s dealt with within the operations of the hydrocarbon industry, for sure.
Weldon: Great point. We’d be remiss…We’re talking about meter freeze, we’re talking about hydrates, we’re talking about things that impact the measurement of natural gas. We’ve talked about the impacts on our control system. Just as an aside I just thought about, I ran into an issue some years back with a tank-level detector that had freezing problems.
David: Absolutely.
Weldon: I had forgotten about that. What I was going to mention though is, we’re talking about things freezing in the pipeline in a instrumentation, but we’d be a little remiss if we didn’t talk about the problems with chromatography sampling and those things. That’s a whole podcast itself.
Just a quick mention that for us down here in the South that don’t battle cool weather very often, we can get into a lot more trouble in the winter with sampling and with our fixed chromatograph installations than we do in the summer.
That heat trace that we installed for use in the normal months, we may not have put enough wattage into that when we get into really cold spells. We’ve got to be aware that impact on our sampling chromatography systems too, don’t we?
David: That’s right. There’s a lot of work that has gone through the years. It’s very commonly used now in equation of state models to help predict and determine those critical points, hydrocarbon dew points, water vapor dew points, and things like that.
We know those critical points of temperature and pressure where we’re going to start experiencing changes of state within our fluids that were measuring and in our sampling-like systems you mentioned, in our analytical systems and things like that.
It’s very, very important that not only the instrumentation, the analytical devices, but the sampling systems themselves are designed very, very carefully inconsiderate of the operating conditions that you’re going to experience so you can maintain those fluids in a state that don’t cause you operational problems, blockages, or changes of state within your sampling systems and sampling lines.
Weldon: Great point there. Anything else you want to add David? Any other thoughts of your mind on this topic?
David: Now that I’m long in the tooth and short of hair on the top of my head, I would be lying if I said I missed being out there in knee-deep snow-breaking pipeline for you, just because I don’t miss it. [laughs] Here again, it’s just a reality of the business, we’re in, the compounds and fluids we’re dealing with.
The more attention that can be given to it, not only from a metering control standpoint but operations overall, will pay dividends in the long run for sure. A lot of measurement error and imbalance from an accounting standpoint has been the product of meter errors caused by freezing. That’s why meter design, installation, and all that are so important.
Here again, make sure your systems are leak-free. If you’re dealing with wet fluids, which is a reality in the production in Midstream sectors, take every step you can to minimize the possibility that you’re going to have to deal with these things.
Weldon: I think that’s a great place to leave this, David. Again, I appreciate having you on the podcast. We’ll leave some information on the website about how people can get in touch with if they need to. Thanks again, and try to stay warm.
David: Weldon, it’s been a pleasure. I appreciate the time today, and you all stay warm as well. I look forward to seeing you again in the future.
[background music]
Weldon: Thanks, David. Thanks for listening as we go into the fourth year of our podcast. I hope you’ve enjoyed listening as much as I enjoy doing the episodes. If you do, please tell your boss, your co-workers, and Industry peers about our podcast. We will have a full transcript of this episode on the show notes on our website pipelinepodcastnetwork.com, along with David’s LinkedIn information.
If you have comments or questions about this episode, suggestions about future topics, or if you’d like to offer yourself up to the podcast microphone as a guest, then send me message on LinkedIn or shoot me an email at weldon.wright@fpvprime.com
[music]


