In this episode of the Pipeliners Podcast, Brianne Kurdock and Lee Banse of Babst Calland provide a fall 2026 PHMSA regulatory update. They explain how PHMSA rulemaking works, including the role of the Gas and Liquid Pipeline Advisory Committees, and review the 13 proposed rules considered at the July 30 joint committee meeting. The conversation also covers the pending repair criteria, LNG, and breakout tank rulemakings and how operators can monitor and participate in the process.
2026 Fall Regulatory Update Show Notes, Links, and Insider Terms
- Babst Calland: A law firm whose Washington, D.C.-based Pipeline and HazMat Safety practice, where Brianne Kurdock and Lee Banse work, advises operators on PHMSA compliance, enforcement, special permits, and rulemaking. Babst Calland is a long-term sponsor of the Pipeliners Podcast.
- Brianne Kurdock: Chair of the Pipeline and HazMat Safety practice group, Babst Calland.
- Lee Banse: Associate, Pipeline and HazMat Safety group, Babst Calland.
- PHMSA: The Pipeline and Hazardous Materials Safety Administration, the U.S. Department of Transportation agency that writes and enforces federal pipeline safety regulations.
- Notice-and-Comment Rulemaking: The Administrative Procedure Act process in which an agency publishes a proposed rule, takes public comment, and then issues a final rule. PHMSA’s process is also shaped by the Pipeline Safety Act and its own procedural rules in 49 CFR Part 190.
- ANPRM and NPRM: An advance notice of proposed rulemaking (ANPRM) poses questions to stakeholders before an agency drafts a rule. A notice of proposed rulemaking (NPRM) publishes proposed regulatory text for public comment.
- GPAC and LPAC: The Gas Pipeline Advisory Committee and Liquid Pipeline Advisory Committee, statutorily required committees that review PHMSA’s proposed rules for technical feasibility, reasonableness, cost-effectiveness, and practicability. PHMSA must publish its reasons when it disagrees with their recommendations.
- July 30, 2026 Joint GPAC/LPAC Meeting: A virtual joint meeting that reviewed 13 proposed rules, covering topics such as special permit conditions, in-plant piping, right-of-way patrols, welding operators, class change pressure tests, and reporting deadlines. PHMSA reopened the comment period on the proceedings through September 4, 2026.
- Special Permit: A PHMSA order that waives or modifies compliance with a specific regulation, typically in exchange for alternative conditions that provide an equivalent level of safety. One July proposal limits permit conditions to those directly related to the waived requirement and addresses renewal terms.
- In-Plant Piping Exception: The jurisdictional line between PHMSA-regulated pipeline and facility piping at plants such as refineries and gas processing facilities. Part 195 codifies the exception, while for gas pipelines under Part 192 it has rested on interpretations and never-finalized draft FAQs.
- Right-of-Way Patrols: Required periodic surveillance of pipeline rights-of-way. The proposal would explicitly allow unmanned aerial systems (drones) and satellites to conduct patrols.
- Rupture-Mitigation Valves (RMVs): Automatic or remote-control shutoff valves required on certain new and replaced transmission lines. A July proposal would extend the time to make them operational from 14 days to 90 days.
- Repair Criteria NPRM: PHMSA’s July 2026 proposal to modernize anomaly response criteria for gas transmission and hazardous liquid pipelines, using engineering-based criteria and a schedule of immediate, near-term, and monitored conditions.
- Failure Pressure Ratio (FPR): The ratio of an anomaly’s predicted failure pressure to the pipeline’s operating pressure limit, used to determine how urgently an anomaly must be addressed.
- API RP 1176 and API RP 1183: American Petroleum Institute recommended practices for the assessment and management of cracking (RP 1176) and dents (RP 1183) in pipelines, which the repair criteria proposal draws on.
- Integrity Management (IM): PHMSA’s risk-based program requirements for assessing and remediating pipelines in high consequence areas. The original liquid IM rule from the early 2000s set the 60-day and 180-day repair conditions now proposed for replacement.
- LNG Rulemaking (49 CFR Part 193): PHMSA’s effort to update its LNG facility regulations. The May 2025 ANPRM is linked here; the follow-on NPRM was under OMB review at the time of recording.
- NFPA 59A: The National Fire Protection Association standard for the production, storage, and handling of LNG. PHMSA’s rules reference the 2001 edition, and the agency is weighing whether to incorporate some or all of the 2023 edition.
- Peak Shaving: Utility LNG facilities that store gas to meet demand on the coldest days, often located near population centers. As proposed, the LNG rule covers these along with large import and export terminals and mobile facilities.
- Process Safety Management (PSM): OSHA’s standard (29 CFR 1910.119) for managing the hazards of highly hazardous chemicals. It comes up in the in-plant piping discussion and as a model some in industry want PHMSA to consider for LNG.
- OMB Review: Review by the Office of Management and Budget of significant proposed and final rules, including their cost data, before publication.
- Breakout Tank Inspection Rule: A June 2026 PHMSA proposal to incorporate the fifth edition of API Std 653 for hazardous liquid breakout tanks and to allow risk-based inspection intervals.
- API Std 653: The API standard for inspection, repair, alteration, and reconstruction of aboveground storage tanks. PHMSA currently incorporates the third edition, issued in 2001.
- Risk-Based Inspection (RBI): Setting inspection intervals from an engineering assessment of a tank’s condition, threats, and consequences rather than a fixed schedule. The breakout tank proposal caps RBI-based reinspection intervals at 25 years.
- Gas Mega Rule: PHMSA’s multi-part gas transmission and gathering rulemaking, which among other things brought many gas gathering lines into PHMSA reporting requirements.
- Regulations.gov: The federal portal where rulemaking dockets are posted and public comments are filed. Users can subscribe to a docket to get email notifications when new documents are added.
2026 Fall Regulatory Update Full Episode Transcript
Announcer: Welcome to the Pipeliners Podcast, episode 464, sponsored by Flowstate, providers of pipeline leak detection software built to remove barriers and empower operators. Flowstate helps teams detect anomalies, reduce false alarms, and improve response with practical tools designed for diverse pipeline operations. Learn more at flowstatesolutions.ai.
The Pipeliners Podcast, where professionals, Bubba geeks, and industry insiders share their knowledge and experience about technology, projects, and pipeline operations. And now your host, Russel Treat.
Russel Treat: Thanks for listening to the Pipeliners Podcast. I appreciate you taking the time, and to show that appreciation, we give away a customized YETI tumbler to one listener every episode. This week, our winner is Jeff Stoolman with Iron Core Compliance[CL1] . Congratulations, Jeff. Your YETI is on its way. To learn how you can win this prize, stick around until the end of the episode.
This week, Brianne Kurdock returns and Lee Banse joins us, both of Babst Calland, with a 2026 fall regulatory update.
Hey, Brianne and Lee, welcome to the Pipeliners Podcast. Well, Brianne, I should say welcome back. And Lee, I should say welcome because it’s your first time.
Brianne Kurdock:[CL2] It’s great to be here. Thank you.
Lee Banse: Yeah. Glad to be here.
Russel Treat: Well, as I always do when we’re starting one of these out, let me ask you guys to introduce yourselves. Brianne, I’m going to ask you to go first because you’ve been here and done this before, so you can lead the way for our new guy, Lee.
Brianne Kurdock: Sure. So I’m Brianne Kurdock. I’m a pipeline safety attorney with Babst Calland. I’ve been here about 10 years, and I focus exclusively on pipeline safety. Before coming to Babst, I worked at an industry trade association doing pipeline and environmental work. And then way back in the beginning of my career, I spent five years in PHMSA’s Chief Counsel’s office. So I am pipeline safety all day long, every day.
Russel Treat: Awesome. Lee, tell us about yourself.
Lee Banse: Sure. I’m Lee Banse. I’m also in the pipeline safety group here at Babst Calland, and I’ve been here about four years. I’ve been in private practice for about seven. I also exclusively do pipeline safety work now, working with Brianne and others in the group. I started my career in Texas, where I did a lot of work with the Railroad Commission, the oil and gas regulator down in Texas.
Russel Treat: So when you were in private practice, were you doing exclusively pipeline safety, or were you doing other things?
Lee Banse: When I started in Texas, it was a range of things. I actually did some oil and gas litigation as well, things around property rights. And then at the Railroad Commission, I did some pipeline safety, but also other permitting cases that the Railroad Commission handles, things like wastewater disposal wells, well permits, things like that.
Russel Treat: So what caused you to say, “I want to do exclusively pipeline safety”?
Lee Banse: Well, part of it was just life circumstance. I was in Texas, I’m originally from the DMV, and my wife and I decided during the pandemic that we would like to move back east a little closer to family. So I looked around for things to do. Obviously, there’s not a lot of oil and gas regulation happening in Washington, D.C. But as I was looking, I found Babst Calland, found this group, and thought that it aligned enough. I’ve always done work in the energy industry.
Russel Treat: Yeah. Well, if you’re in Texas and you’re doing law in Texas, there’s a fairly good chance you’re going to do some oil and gas.
Lee Banse: Yeah, there was a good amount of overlap. It seemed like a natural fit.
Russel Treat: So basically, you decided you wanted to move, and then you said, “What can I do?” And then you found Babst Calland and pipeline safety.
Lee Banse: Yeah, that was kind of it.
Russel Treat: Well, you know, we all have our own journey. They all work, right?
Lee Banse: It just took me a while to find it. Now that I’m here, I’m not leaving.
Russel Treat: Exactly, exactly. Well, look, before we dig in too much, I just want to give a shout-out to Babst Calland. You guys have been a long-term sponsor of the podcast. You’ve been our go-to folks for all things regulatory and keeping the listeners updated. We send a newsletter out every month, and you guys give us a regulatory update for that newsletter every month. So first of all, I just want to say thank you to Babst for being such a long-term supporter of the podcast.
Brianne Kurdock: Of course.
Russel Treat: Well, with that, let’s dive in. We’ve talked about this before, but it would probably be helpful for listeners that haven’t heard it, or haven’t heard it recently. What has the current administration stated are their priorities for rulemaking in the pipeline space?
Lee Banse: Sure. So if we think back to January of 2025, with the Trump administration entering office, pretty soon thereafter they issued several executive orders, a couple in particular focused on their energy policies. We’ve got one about unleashing American energy and another about declaring a national energy emergency. The general theme that came out of both of those was directing federal agencies to review their policies and their regulations, find ways to remove undue burdens on the energy industry, and promote the development of domestic energy infrastructure.
Within DOT, obviously, PHMSA is the key modal agency that has a hand in energy policy and regulating energy infrastructure. So soon thereafter, they took those executive orders, those policy statements, and began to implement them in their own regulatory agenda. I think it was in June of 2025, they released this large NPRM and advance notice of proposed rulemaking where they solicited comment from all stakeholders, looking for ways they could modernize their regulatory program. This was a very open approach where they said, “Anything that we’ve done, our guidance, our procedures, where you think we could improve them, incorporate new technologies, or update to more modern standards, please let us know and we will consider that.”
Russel Treat: Cool. I want to talk a little bit, too, and we’ve done this in the past, but I think it’d be helpful to review for listeners that may not have heard it before. Let’s talk about the LPAC and the GPAC and how they play into the rulemaking process. What are they, and how do they support the rulemaking process?
Lee Banse: Sure. I’ll set it up one step further back and walk through the whole rulemaking process in general. PHMSA is authorized by the Pipeline Safety Act to promulgate pipeline safety standards. Their process for doing so is controlled by the Administrative Procedure Act and the Pipeline Safety Act itself, and some of it is in their own regulations in Part 190.
The Administrative Procedure Act instructs all federal agencies how to engage in rulemaking, and the most common way to do this is what’s known as notice and comment, where the agency publishes a proposed rule, solicits public comment on it, and then goes from there. That’s not the exclusive way to do it. When there are less substantial rules, or rules where they have good reason not to ask for comment, they can just go ahead and issue a rule without going through that process. We’ve seen them do that a good amount recently as they are cleaning up their regulations, things like updating the incorporated standards to the current versions, things that are not really controversial at all. You know, we don’t fax special permit applications anymore, right? Fixing things like that.
Russel Treat: Yeah. No, it’s funny, we just recently got rid of our fax number.
Lee Banse: Right, right. So lots of cleanup. But within that rulemaking process, one thing that sets pipeline safety apart, something specifically required by the Pipeline Safety Act, is for PHMSA to establish the pipeline advisory committees: the GPAC, which is on the gas side, and the LPAC, which is on liquids. PHMSA has to present their proposed rules to these committees for their comments and recommendations and consider those as they go through the rulemaking process. Additionally, if PHMSA, in their review of the comments and recommendations of the GPAC and LPAC, decides to disagree with them, they need to publish the reasons why.
Russel Treat: Right. So basically, the LPAC and the GPAC are the way for industry, the public, and other stakeholders to provide their input to the rulemaking process in a formalized way, because those meetings are formal. They’re on the record, and they have a full transcription. For those that haven’t sat in one, it kind of looks like a committee meeting in Congress. Kind of. The committee isn’t sitting up high looking down on us lowly folks sitting in front of them; it’s more of a U-shaped table. But it’s a formal process with a chair, and they’re working through it formally.
I think this is really interesting. When I have these conversations, I always think back to my high school political science and the political science I had to take in college, and neither of those got to this level, right? You kind of understand what the pieces of government are, how they work, how laws are made, and how people are elected. But the real work of the government that impacts people’s lives is right here. It’s in this administrative and rulemaking process across all the executive agencies.
So anyways, there was a recent GPAC and LPAC meeting. I think that was at the end of July, July 30th. What was discussed, and what was the outcome of that meeting?
Brianne Kurdock: Sure. So we were talking a little bit about PHMSA’s recent regulatory agenda and their focus on modernization, looking at ways they can streamline and simplify the regs, and also places where, over time, Parts 192 and 195 may have departed from each other without a real pipeline safety reason to do so. So they’re seeking to align them.
At this July 30th meeting, there were 13 rules considered, and they covered the gamut. We saw things that have attracted major operator attention ever since I’ve been at Babst, like special permit reform. That proposed rule itself is not terribly long or complicated, but it’s PHMSA saying, “All right, when we issue a special permit, we are only going to add conditions that are substantially and directly related to what the operator is seeking to have waived.”
There has previously been a lot of conversation about how hard it’s been to navigate the special permit process recently, how conditions have been added that did not really reflect what the operator was seeking from the agency, and how the process was also taking a long period of time. It had become this labyrinthine effort to get to where you needed to go. So PHMSA is trying to make it a simpler process and get it back to the place where it was always intended to be.
They’re also looking at renewals of special permits. When I think back to when I worked at the agency, years and years ago, there weren’t renewals for permits, right? You got your permit, and that was what your permit looked like for as long as you needed it. Then at a certain point, the agency started adding renewal terms, like a 10-year term, wanting the operator to come back in at that 10-year mark to say, “Okay, is this permit still working? Do you still need it?” So in this proposal, they’re looking at what a good renewal timeframe is. That was discussed at the GPAC and the LPAC; it was before both committees.
Russel Treat: I’m asking you guys to discern from the conversation, but was there any kind of consensus or agreement as to what that renewal term should be?
Brianne Kurdock: Most of the discussion was around a 15-year interval. When a permit is renewed, the agency is going to look at whether the conditions are still a good fit and whether they need to add conditions. So if you make it too short, everyone’s coming back in, and you’re disincentivizing anyone from asking for a permit if they know they’ve got to come back in every two years.
Russel Treat: Right, right.
Brianne Kurdock: But then you also don’t want it out too far. So most of the discussion centered around 15 years. We’ll see what the agency does.
Russel Treat: Can you guys give me a definition of a special permit? What is it, and how are they used?
Brianne Kurdock: Sure. So a special permit is for when there is an element of the code that, for whatever reason, the operator can’t meet or can’t comply with. You can go to PHMSA and ask them to waive that requirement in exchange for…
Russel Treat: Yeah, it’s not like you just get a blank check. It’s not, “I’m not doing this.” It’s, “I’m going to do this, which is different than that, and here’s why.”
Brianne Kurdock: Right, right. So instead, PHMSA will establish alternative conditions that would provide an equivalent level of safety around that element. That’s the purpose of the special permit.
Russel Treat: Yeah, that sounds like it could be an interesting conversation. So we talked about special permits and alignment of the rules. What other kinds of things went through the GPAC and LPAC meetings?
Lee Banse: Sure. Some others dealt with clarification, areas where operators had experienced confusion in the past. One was around right-of-way patrols. PHMSA has proposed to explicitly add that you can use unmanned aerial systems or satellites to conduct patrols. Before, the rule explicitly allowed flyovers, but PHMSA had relied on interpretations when operators had questions about whether they could use things like drones. Now that is proposed to be explicitly put in the rule.
Another one is an in-plant piping exception in Part 192, trying to figure out the extent to which PHMSA would apply their regulations to things like midstream processing facilities. In Part 195, you have an in-plant piping exception for production, manufacturing, and refining facilities, and a clear demarcation point of where PHMSA’s regulation would end at, say, a refinery. But for gas pipelines under Part 192, that concept was a creature of interpretation. I just know personally from my practice, I fielded a lot of questions from people trying to figure out what piping is PHMSA’s and what piping would fall under some alternative program, like OSHA’s process safety management program.
Russel Treat: Right. And where’s the demarcation, and how do you know?
Lee Banse: Precisely.
Russel Treat: Yeah, there’s been a huge amount of energy in the last 10 years spent on that question, particularly following the so-called Mega Rule, when a lot of the gathering lines got roped into reporting for PHMSA.
Lee Banse: Right. In the mid-2010s, there was an attempt to draft a set of FAQs around it. They did publish draft FAQs, but they were never finalized. So part of the discussion was around those draft FAQs and how to codify them and give operators clarity about what jurisdiction applies at in-plant piping systems.
Brianne Kurdock: Other topics that were discussed were annual reporting deadlines. The liquid side has a June date, and the gas side is March, so they’re trying to bring those together. There are a lot of consistency themes from the agency, trying to bring Parts 192 and 195 to a consistent level as much as they can.
A couple of other things were adjustments to OPID notifications for construction, looking at those thresholds and making sure they incorporate inflation so the thresholds are reasonable and worthwhile. The proposal was for pipeline construction notifications to go from a $10 million threshold to $20 million. There was also a proposal on storage to go from $200,000 to $300,000. This is along the same lines as what the agency does pretty frequently, looking at its thresholds and how to incorporate inflation.
Russel Treat: Yeah, I would categorize those things as not really administrative, but borderline administrative, right? There may be some controversy about where you set the number, but there’s really no controversy that it needs to move. Anything else that was key in this last set of LPAC and GPAC meetings?
Lee Banse: Looking at the list, there was a similar inflation adjustment for accident reporting on hazardous liquid lines. The threshold had been around $50,000 for a long time, and that had grown misaligned with the threshold for gas, so they adjusted that as well.
The others are quick-hit topics. One is elimination of a welding prohibition: welders at compressor stations could not be qualified through NDT, nondestructive testing, and there’s a proposed rule to remove that prohibition from the regs. Another one harmonizes class location pressure test requirements with what’s in Subpart J, the general pressure test requirements. Both generally required an eight-hour pressure test, but within Subpart J there’s a four-hour requirement for short segments of pipe and fabricated units, and that had not been reflected in the class location change regulation. So they’re making sure those align with each other.
I think the big picture is that you have a lot of topics, and they vary across the spectrum. But the common themes are: Where can we use new technologies? Where can we respond to places where operators have repeated questions? And how can we provide clarity and simplification?
Russel Treat: A lot of that is just about what I would call regulatory efficiency, regulatory effectiveness, right? It’s not safety so much as it is regulatory.
Lee Banse: Right. Obviously safety is still the top priority, and it’s about making sure that the regs are constructed in a way that drives that result.
Russel Treat: Yeah. I think this is one of the things that sometimes gets lost in the PHMSA conversations. From a safety perspective, we need to be looking at what things cost and what it takes to operationalize requirements so we can do those things in a way that’s efficient and effective, because every incremental dollar we save on safety, we can spend on doing safety elsewhere.
Lee Banse: Exactly.
Russel Treat: People are not going to reduce their safety budgets, but they will reapply, or more effectively apply, the budgets they have. So a lot of this goes to that, making sure that regulations are practical.
Brianne Kurdock: Another one they discussed at the meeting was the timeframe to make rupture-mitigation valves operational. The current timeframe is 14 days, and the proposal was to go to 90 days. There was a lot of discussion about why 14 days is not practical, and we heard from some of the operators on the committee who said, “Look, a lot of times we’re waiting on the power company or we’re waiting on permits, and we don’t want to run afoul of the 14-day deadline. We realize this is important and it needs to get done, but we need some flexibility so we’re not just walking into a noncompliance.” So I find those discussions interesting.
Russel Treat: Yeah. It’s so interesting to me how many of these things look simple on their face, and then when you unpack them and try to execute them, they’re not simple at all. So what’s next in the process with all this?
Brianne Kurdock: Public comments have already been submitted. After a GPAC or LPAC meeting, the agency allows the public to file comments on what they heard, and that comment deadline ended on September 4th. The agency actually extended it a little bit to make sure that everyone had seen the transcript and was able to file comments. So those comments are in.
The agency will review what’s called the report from the GPAC and LPAC committees, which is the transcript plus the voting slides. They will review those recommendations from the committees, review the public comments, and then proceed with issuing a final rule. For the 13 rules we were discussing, that’s the next step. The agency has a very aggressive rulemaking agenda, and there are lots of other rules in various stages. But those 13 have been through the GPAC and LPAC, and the comment period has ended, so a final rule is the next step.
Russel Treat: Okay, cool. I know there was a recently published notice of proposed rulemaking on repair criteria. Can you give us an overview of what’s in that? Let’s start there, and we’ll unpack from there.
Lee Banse: Sure. So we’re diving into some of the significant rulemakings the agency is engaged in and some of their major priorities. The repair criteria NPRM was published in July. It follows an ANPRM published, I think, in May of 2025, where PHMSA asked stakeholders, “What do you want to see around integrity management and the existing repair criteria? How do you evaluate anomalies, how do you respond to those anomalies, and how can we take advantage of advancements in modern engineering?”
They received comments on that and published the NPRM in July. It’s a highly technical rule. I recommend everyone go and try to read it and figure it out. All the different anomalies have their own very specific set of criteria, but what you see generally is increased use of the FPR, the failure pressure ratio, to determine when an anomaly needs to be acted on.
You also see new anomaly schedules, the timelines for responding to anomalies. The liquid schedules haven’t been changed since the original IM rule came out in the early 2000s, where you had immediate, 60-day, and 180-day conditions. Those are now being changed to what’s referred to as immediate, where if it’s discovered you have to go out immediately and fix it; near-term, where you have a year to go out and remediate; and other conditions, which can be monitored between assessments to determine whether and when you have to go out and remediate.
And then you see an expansion of the engineering tools available to operators to evaluate anomalies, with the incorporation of more recently developed standards: API RP 1176 on cracks, API RP 1183 on dents, and things of that nature.
Russel Treat: What about the repair approaches themselves? Are there updates addressing composites and some of the newer repair technologies, or is that not addressed in this rulemaking?
Brianne Kurdock: I think the biggest takeaway is that everyone supports the incorporation of new technology, as Lee was saying, like the new standards, making sure we’re bringing the rules up to where the technology is. What I saw in some of the comments was a concern about a layered effect. If you’re going to make changes across the board, what have you created at the end of the day? Is there too much conservatism because you’ve got this layered effect of changes? So it’s about making sure the agency has a sense of where they end up. If you’re changing the failure pressure ratio and you’re changing other pieces of the rule, what does that look like together?
Russel Treat: Yeah, that is way outside my expertise, and it’s highly technical. You’ve got to have some pretty good engineers, and the analysis necessary for some of these larger operators to understand and quantify the impact of changes like that is big.
Lee Banse: Yeah, you could get a dissertation just reading through all the comments and the NPRM, all the stuff that’s in there.
Russel Treat: Yeah. What percentage of that is written by PhD engineers, right?
Lee Banse: Right, right.
Russel Treat: That’s almost as fun as reading stuff written by attorneys.
Brianne Kurdock: It’s always good to see so many comments, though. It’s great to see all the different stakeholders participating. It has to be helpful for the agency to get all those different viewpoints.
Russel Treat: Yeah, absolutely. And it really does point to the challenge an organization like PHMSA has in working through all that and putting a rule together, particularly for something like repair criteria. It’s a very, very big undertaking. What I would say about repair criteria is, given the amount of research dollars spent through PHMSA, PRCI, and many others, and the amount of technology and tools coming out every year, repair criteria get dated real quick. So PHMSA has to write it in a way that doesn’t mandate a particular technical approach. They have to write it so that any technical approach, as long as it fits within the criteria, is acceptable. And that is a way different kind of challenge.
Brianne Kurdock: It is.
Russel Treat: Y’all can’t see this because it’s an audio-only podcast, but we’re on video while we’re talking, and Lee and Brianne are nodding their heads in agreement.
Anyways, we should also talk about LNG. I know there’s an LNG rulemaking going on as well. What’s going on on the LNG side?
Brianne Kurdock: Sure, I can take that one. PHMSA first issued what’s called an advance notice of proposed rulemaking in May of 2025. They don’t always do those advance notices; they’re called ANPRMs for short. For some of these bigger rules, they do issue them. An ANPRM is a list of questions trying to gauge where people want to see changes, and once they see those comments, they come back with what we’re accustomed to, the notice of proposed rulemaking.
Here, they did the ANPRM a year ago. They’ve written the NPRM, and it is over at OMB. I actually checked this morning to make sure we were current. It’s still at OMB, but we anticipate it coming out of the OMB review process any day now, because it’s been over there since August 21st. Ultimately, it will be published for comment, and folks will be able to see the proposal to change the LNG rules and comment on it. Then it’s the same process. At some point, it will be in front of the GPAC as well.
A couple of concepts folks have been talking about on the LNG side: PHMSA incorporates NFPA 59A, the 2001 edition. That, of course, is 25 years old, so the agency is looking at whether they should incorporate the 2023 edition across the board or just pieces of it. A lot of industry is asking the agency to look at OSHA’s PSM, the process safety management approach, and whether pieces of that should be incorporated for LNG. Those are the bigger topics. We also saw some discussion on duplication between agencies. If the Coast Guard is already out there looking at security of LNG facilities, do we also need PHMSA out there? Those types of things. So we’ll see what’s in the NPRM and go from there.
There was a lot of interest in the ANPRM, and a lot of cost data was submitted. I always encourage folks, if you have the data, give it to the agency. The agency needs to look at it.
Russel Treat: Well, yeah, because that’s going to go to other agencies within the government, like OMB, that are going to take a look at it. And OMB can declare something commercially not feasible, right? So that’s important.
I want to ask a question, and this is going to absolutely display my ignorance. When I first started reading about the LNG rule, and I know very, very little about it, I was thinking about LNG in terms of these huge facilities where we’re exporting. But the reality is many utilities have smaller LNG facilities located in high-population areas that are there for peak days and such. Does this rule cover both of those? Is it specific to one or the other? Can you educate me a bit on the scope of the LNG rule?
Brianne Kurdock: Sure. As proposed, it covers all of those facilities: your big importers and exporters, and your peak shavers, which is what the utilities use. Mobile facilities are also covered. So a lot of the trades spent time trying to divide those facilities, saying, “Okay, PHMSA, this is your proposal. But if we’re talking about export, this is what should happen. If we’re talking about mobile, this is what should happen.” At the moment, the way the ANPRM was proposed, all of those facilities would be covered in some shape or form.
Russel Treat: Again, y’all can’t see it, but I’m nodding my head because I’m thinking about what Brianne just said, and it makes sense to me. I’ve seen other PHMSA rulemakings where they’re trying to simplify something and the industry comes back and says, “Yeah, you can’t simplify that.” This sounds like that situation, because to me those three kinds of LNG operations are radically different and have radically different needs. If you want to write an LNG rule, it’s got to deal with those three different kinds of things. And then you’ve got to find where the lines are. When do you move from peak shaving to big LNG, right?
Brianne Kurdock: Yeah.
Russel Treat: Okay, cool. That’s helpful. So what you’re telling me is we should have another rule to talk about here soon.
Brianne Kurdock: Yes.
Russel Treat: Okay. So anything else in the pipeline? In y’all’s take, what are the next two or three things coming down?
Lee Banse: I think probably the next one that’s active right now and has been garnering a lot of interest is the breakout tank inspection rule. This was an NPRM published back in June, and comments have already been received. In that rulemaking, PHMSA is looking at revising Part 195 around breakout tank inspections, primarily updating to a more recent version of API 653, the standard that governs inspections, repairs, and alterations of these tanks, and making sure the rules capture developments since then. The currently incorporated edition was first published in the early 2000s, and they have kept up a little bit over time through the errata and addenda, but there are more recent developments captured in the fifth edition.
Russel Treat: Well, the technology for doing those kinds of inspections has radically changed in that period of time. What we can do with radars and NDT[CL3] and that sort of thing is completely different than what we were doing 20 years ago.
Lee Banse: Absolutely, absolutely. And the other significant change is allowing operators to once again use a risk-based interval to set the reinspection. API 653 provides for RBI based on the results of the prior inspection. In 2015, PHMSA decided to cap the inspection interval at 20 years and not allow operators to use RBI. This rule proposes to once again allow RBI, but with a cap at 25 years, I think, for the reinspection.
Russel Treat: Right. So you’re moving from 20 to 25 years if the RBI supports a 25-year reinspection. Wow. Based on all this conversation, I would expect another round of LPAC and GPAC meetings before the end of the year.
Lee Banse: I think that’s a fair assessment. There are just so many rules, and a lot coming out that’s going to need to be reviewed. We’re approaching the midway point of the current administration, which means that whatever they’re going to get done, they’ve probably got to get done in the next 18 months. So there’ll be a surge of effort to get things across the finish line, I’m sure.
Brianne Kurdock: Definitely. I think we should all expect to see one, if not two, GPAC and LPAC meetings scheduled. And just to loop back to something we said at the beginning, the meeting in July was virtual, and the reason they do that is to avoid the significant hurdles of getting everyone on the same schedule. But they’re not all virtual. The distribution rule meeting earlier in the year, I think it was in May, was in person at DOT headquarters. So they’ve been trying to get them scheduled as quickly as they can and get through this.
I will say, I’m sure Russel was in the same room with me years ago, watching a GPAC meeting where we sat all day and the committee got through, like, one issue on the LDAR rule. It is great to watch the committee be very efficient moving through their issues and discussions. They’re still discussing their concerns, but they’re moving at a quicker pace, which is great to watch.
Russel Treat: Yeah, I remember the meeting you’re talking about very well, because I think we were sitting there thinking, “How many times do we need to make this point?”
Brianne Kurdock: Right, right, right.
Russel Treat: I think the way the agency is running those meetings now is, “Look, we want the points on the record, but they only need to be on the record once.”
Brianne Kurdock: Exactly.
Russel Treat: And that by itself is going to shorten meetings. Well, look, this is great. I think the last thing we ought to talk about, just for operators’ benefit, is for operators interested in these rules, what’s the best way to monitor them and participate in them?
Brianne Kurdock: Sure. You can monitor their status a couple of different ways. If you belong to a trade association, the trades do updates; they send out where the rules are. You can also monitor them yourself through Regulations.gov. You can subscribe to the docket, and it will send you an email when something has changed, for instance, when a notice of proposed rulemaking has been placed in the docket.
In terms of participation, I definitely urge everyone to file comments. All stakeholders should be interested in filing comments. If you’re an operator, work with your trade association. If you have data, try to submit it to PHMSA. You can do that a couple of different ways: you can submit it yourself, or you can submit it through the trade. The agency has provisions for protecting anything that might be proprietary, and how to handle that is right in the notices that come out. I think it’s important to get that data in, if it supports your issue or whatever is of concern to you as a stakeholder, to make sure the agency gets to see it.
Russel Treat: I think that’s great. For most operators, the most effective way to do this is to work closely with their industry association, whether that’s GPA or API or AGA or INGAA or whatever, right? There are a lot of them. They all have regulatory advocacy groups that closely monitor all this stuff, and those organizations very deliberately get comments on the record that are the distillation of everything coming from their community. Particularly for smaller operators that don’t have full-time staff working on this, that’s often the best way to go.
Well, look, thank you guys so much. I feel like I’m current on what’s going on, for a minute.
Brianne Kurdock: For a minute.
Russel Treat: All right. Great. Thank you, guys.
I hope you enjoyed this week’s episode of the Pipeliners Podcast and our conversation with Brianne and Lee. Just a reminder, you should register to win our customized Pipeliners Podcast YETI tumbler. Simply visit PipelinePodcastNetwork.com and enter yourself in the drawing. If you have ideas, questions, or topics you’d be interested in, or if you’d like to be a guest, please let me know either on the Contact Us page at PipelinePodcastNetwork.com or reach out to me on LinkedIn. Thanks for listening. I’ll talk to you next week.