This month’s Oil & Gas Measurement Podcast episode features Martin Dingman discussing clamp-on ultrasonic equipment, why they are beneficial and how to properly use the clamp-on meters to get accurate results. Martin shares insights from his extensive experience at Siemens, discussing topics such as clamp-on ultrasonic flow meters, engineered meter runs, testing procedures, and cost-effective solutions for achieving accurate measurements in various applications, including oil and gas. They also touch upon the importance of understanding measurement technology and proper application techniques.
Listen to the episode now to learn about the testing being done using clamp-on ultrasonic meters, how they are transported, and what kind of information these meters can provide.
Clamp-On Ultrasonic Meters Show Notes, Links, and Insider Terms
- Martin Dingman is the business development professional in the oil and gas sector at Siemens. Connect with Martin on LinkedIn.
- Siemens is the world’s leading supplier of innovative and environmentally friendly products, solutions and services for industrial customers.
- Upstream is the operation stage in the oil and gas industry that involves exploration and production.
- Midstream is the processing, storing, transporting and marketing of oil, natural gas, and natural gas liquids.
- Downstream is the process involved in converting oil and gas into the finished product, including refining crude oil into gasoline, natural gas liquids, diesel, and a variety of other energy sources. The closer an oil and gas company is to the process of providing consumers with petroleum products, the further downstream the company is said to be.
- Ultrasonic Flow Meter is a sophisticated device utilized to gauge the flow of liquids or gases within a pipe by employing ultrasonic waves. These waves traverse the pipe in both the direction of the flow and against it. By analyzing the interaction of these ultrasonic waves with the velocity of the flowing substance, the flow rate can be accurately determined.
- Multi-path Ultrasonic Meter is a meter utilizing multiple pairs of ultrasonic transduces that fire sound pulses back and forth across the pipe on different lines (paths), each with a different geometric cross section of the pipe. By comparing the speed of sound of the different paths, valuable information can be obtained about the quality of the measurement data. Most ultrasonic meters approved for Custody Transfer use at least 4 pairs of sensors.
- Clamp-On Ultrasonic Meter is designed with transducers that are designed to clamp to the exterior of a section of pipe, with no penetration into the pipe. They may be temporarily or permanently installed. The differ from a convention ultrasonic flow meter in that their transducers are not installed into a dedication pipeline fitting body.
- Custody Transfer Measurement is a measurement facility that has been designed, fabricated, tested, installed, and operated in compliance with specific industry standards documents, such as AGA-9 standard for multipath ultrasonic meters.
- Meter Calibration typically refers to sending a meter and often its associated piping to a commercial flow calibration lab with extremely accurate reference meters that are traceable to NIST standards. The meter under test is temporarily installed in-line with the reference meters and flow is varied and adjusted to multiple points across the meter’s expected operation flow range. The meter manufacturer then uses the data points gathered to program adjustments into the meter’s microprocessor, reducing the measured error.
- Flow Profile refers to how a liquid moves within a pipe. A “fully developed” flow profile is one where gas near the pipe walls moves in at a uniform, but slower, speed around the entire perimeter of the pipe. Gas in the center third of the pipe is moving slightly faster, with no swirling or eddies taking place. A fully developed and consistent flow profile is critical for many meter types.
- Installation Effect refers to the negative impact on measurement accuracy and repeatability because the gas Flow Profile has been disrupted by the piping arrangement upstream of the meter or intrusions into the gas flow. A classic Installation Effect problem that creates inaccurate measurement is swirl within the pipe caused by multiple bends or elbows. Such swirl can persist for many pipe diameters downstream of the disruption.
- CEESI – https://www.ceesi.com/flow-meter-calibrations Colorado Engineering Experiment Station, Inc is one of the largest commercial calibration laboratories in North America, providing a comprehensive range of calibration services. Our calibration capabilities include a wide range of flow rates, temperatures, and pressures utilizing numerous test gasses. CEESI
- AGA (American Gas Association) represents companies delivering natural gas safely, reliably, and in an environmentally responsible way to help improve the quality of life for their customers every day. AGA’s mission is to provide clear value to its membership and serve as the indispensable, leading voice and facilitator on its behalf in promoting the safe, reliable, and efficient delivery of natural gas to homes and businesses across the nation.
- AGA-9 – American Gas Association Report No. 9 is an industry standards document relating to the design, installation, and use of Ultrasonic Flow Meters for natural gas custody transfer measurement.
- Reynolds Number is a dimensionless number used to predict the behavior of a flowing fluid.
- ISHM (The International School of Hydrocarbon Measurement) is held annually in Oklahoma City. ISHM provides a number of 1–2 hour training classes on various topics of interest to those in oil and gas measurement.
Clamp-On Ultrasonic Meters Full Episode Transcript
Weldon Wright: Welcome to Episode 30 of the “Oil & Gas Measurement Podcast,” sponsored by GCI, Gas Certification Institute. For more than 20 years, GCI has been providing measurement fundamentals training and measurement standard operating procedures to the oil and gas industry.
GCI’s instructor-led gas measurement and liquid measurement training classes, coupled with comprehensive measurement standard operating procedures, provides valuable tools to both the back office and field personnel.
Announcer: Welcome to the Oil and Gas Measurement Podcast, where measurement professionals, Bubba geeks, and gurus share their knowledge, experience, and likely a tall tale or two on measurement topics for the oil and gas industry. Now your host, Weldon Wright.
Weldon: Hello. I’m your host, Weldon Wright, with FpvPrime Measurement Consulting. I’m here today with Martin Dingman with Siemens Process Instrumentation. We may raise some hackles today because we’re going to talk about cases where non-custody transfer grade measurement may be the best fit.
Before we get started, Martin, tell our audience a little bit about yourself and what you do for Siemens. I understand you’ve been there a while.
Martin Dingman: I have, Weldon. Great to be on your podcast with you today and chat with you for a bit. A little background on myself, I’ve been with Siemens, I guess you’d say, for a total of about 32 years now. I started back in 1991 with a company by the name of Controlotron working with clamps on ultrasonic flowmeters.
From then, back in 2006, we were acquired by Siemens. They rolled that product up into their portfolio. I was the product marketing manager for several years for ClampOn. I’ve done ClampOn for a little over 32 years now.
As my tenure started to grow within Siemens, I started to get involved in some other areas of business development, within digitalization, industry 4.0, everything that’s going on with all the communications, cybersecurity.
Over the last several years, I’ve been working, focusing mostly on oil and gas nationally as a business developer working with mid stream, upstream pipeline companies, working on water management, working on different flow level pressure temperature applications, but covering the whole Siemens portfolio for oil and gas.
Weldon: Great, Martin. Here on this podcast, we talk primarily about custody transfer grade measurement and things related to custody transfer grade measurement. After all, that’s the cash register of the business as we like to say. There’s a lot of very valid cases where we need good quality measurement. We need accurate measurement.
The application does not strictly require that we need custody transfer standards or contractual standards. That’s what we’d like to talk a little bit about today. I know we have a lot of things going on with the AGA and potential new standards coming out, modifying existing standards, new standards coming out for a multipack and our larger custody transfer grade measurement.
We have some standards coming out for some smaller devices also. Outside of that, there’s times, like we said, we need good accurate measurement, but it may not fit the mold of custody transfer. As you and I talked prior to this podcast, you had brought up an example of a project you worked on recently for that.
The main thing that interested me is the work that you all have done in the labs with clamp on ultrasonic equipment. From the measurement purist standpoint, we, “Oh, clamp on, oh, we can’t have that. We need a custody transfer grade.”
Not only is it valid in a lot of cases and a lot of applications, but you all have come up with enough evidence to show that it is a good, accurate measurement, isn’t it?
Martin: It is, definitely. We talked earlier. There’s clamp on field installations. Then, there’s your inlying custody transfer meters. When we talk about clamp on field installations, that’s mounting onto an existing section of pipe. When we look at a clamp on an ultrasonic flow meter, you’re buying half a flow meter. What’s the other half of your meter? That’s the pipe.
When you’re on the outside of the pipe, we don’t know what’s going on inside. Is it at a round? What’s the actual cross sectional area? Is there any build up in there?
We’ll have customers that a lot of times they’ll think, “A clamp on flow meter, hey, I can just stick this thing anywhere on a pipe, even with one diameter of 90 degree elbow at a plain and I’m going to get an accurate measurement.”
That’s not the case. A lot of times, we’ll teach customers and users and say, “Listen, for external applications, we can get half to one percent. Measure the OD. Measure the wall thickness with an ultrasonic thickness gauge. Get as much measurement around that pipe to get as much of that cross sectional area accuracy as we can.”
We can put one, two, three, or four pairs of transducers on a pipe. Then, there will be times where everything is lined up. It’s matching. The speed of sound may match the natural gas. It might match the NGL or the crude, but the customer will go, “Hey, we’re off by five or six percent. Why is that?”
Then, you have to look at, now, you’ve got a full profile of liquid and gas. Where are you located on the pipe? In those instances we’ll find out, “You’ve got two pipe diameters upstream coming off of a 90 degree elbow at a point.
We always talk about how we want to have as much upstream as possible. A little less on the downstream, but more on the upstream. What we’ve been doing is when you take that same technology that we have and you apply that to an engineered meter run.
You look at the in-line ultrasonic manufacturers. They build a cast with 4, 6, 8, 12 transducers in there. They’re all in-line. A lot of money invested in that meter right there. Then, you’ve got to still comply to the AGA 9, which is basically a guideline that tells you, “Hey, these are the best practices.”
That guideline, if you’re a unidirectional or a bidirectional, it will have, for 2-10D upstream, maybe a conditioner in the middle. We’ve been using the CPA plates.
Then, you have your meter body, which might be the in-line or a section of piping that we can put the clamp-on transducers on. Then, you’ll have about a 5D section downstream.
If it’s bidirectional, you do 2-10D up, 2-10D down with conditioning in between. What you have there, now, is you have an engineered meter run. When you’re working with a measurement fabrication house, everything is miced out to such detail that you have an accurate cross sectional area.
The pipe is round. It might even be honed. The section that we’re going to clamp on is honed. It might even be nickel plated, which would stop some of any kind of buildup, any kind of carbon type buildup on a gas application.
Now, when you apply a clamp-on pull meter on there, you’re going to get an accuracy out of the box, before calibration, better than a half percent. With AGA 9 states, if it’s going to meet custody transfer accuracy or be defined as custody transfer, as found needs to meet a certain uncertainty for different size pipe ranges.
Then, once you’ve achieved that as found, then they’ll go ahead and calibrate it. We’ve calibrated…So far, we’ve been on…We’ve done this many years back with our legacy product of 10 10. Over the past year, we’ve done a couple of 10 inch pipes, 16 inch pipes…We’ve had those over at CZ.
The left data is between .02 to .07, so better than a tenth of a percent.
Weldon: Wow. That’s some impressive numbers there. I like it.
That’s the main area that I want to talk about here, is the difference in that concept between taking that clamp on meter and putting it upstream of your existing ultrasonic or orifice installation to see if it “checks out” in air quotes. I’m not sure, sometimes, what checks out is supposed to mean.
Although, you can model differences. That’s been proven valid. If we use the clamp-on technology, we mark our sensor locations, and we gather information annually, semi-annually. There’s some valid reasons to do that.
The entire concept of an engineered meter run where we’ve miced everything, where we have a flow profile that we believe in as opposed to whatever’s in the pipe. You mentioned just downstream of that 90, let’s not forget they probably also put a control valve that’s opening and closing in the middle of that.
Martin: Yes, I left out the control valve. There’s always one of those in there somewhere. Partially open.
Weldon: We love it when we get those ultra quiet valve trims, right? Of course, there’s all that noise in the area–we can’t hear it–right up there where the meter really likes it.
Back to what we should be talking about. That whole concept of an engineered meter tube, a tube that has been designed to assure a good profile. That’s what we’d like to discuss today. If you could talk some more about the testing you’ve all done at CC, as well as the installation project down in south Texas that we visited about prior. I think our listeners would find a lot of value in that.
Martin: Definitely. Thanks. Testing at CC over the last, I would say, probably a year and a half, like I mentioned, we did the two 10 inch. We did the 16 inch. Everything has left the laboratory at better than a tenth of a percent. That’s basically bringing in the complete meter run. Everything is already pre installed.
We’ll have the measurement fabrication house design the spool. Everything will be fully painted. Transducers will be mounted. That’ll be basically pegged and shipped as a complete meter run over to CC. They’ll run that calibration. That usually takes a few hours, getting it installed and what have you.
As long as you’ve got that engineered meter running and everything is programmed into that transmitter accurately, we can expect to meet the guidelines for the as found data and as left to be considered custody transfer.
The two applications…There’s two, actually. I’m going to bring up another one as well. We’ve done one probably a couple years back. It was actually a 16 inch line at a compressor station. If you’re looking at a 16 inch orifice meter, you’re looking at a major expense there. Even on the 16 inch ultrasonic meter, very expensive as well.
What they were looking for there was for custody quality. It didn’t have to be a custody transfer. It wasn’t a billing meter, but they wanted to have the best accuracy they could without it being called billing.
Before I finish on that, that goes back to one of the things I was talking about earlier. A lot of times, someone, a customer, an end user, might only want, say, one percent. That one percent can’t be guaranteed by just clamping onto somebody’s pipe. You can’t certify that.
In a case like this where you can build a meter run that’s honed out and engineered, you can get the custody quality. In some cases, you can get a meter run that may not be honed out and what have you to get that one percent, but at least you’re getting something from a lab now that’s certified, that says, “When I drop this in-line, I’m going to get.”
Weldon: The main takeaway there is that you’re sending the entire meter run to CC or one of the other labs just like we would with that standard great, big, fitting multipath ultrasonic.
Martin: Exactly. Like I mentioned earlier, when you buy a clamp on, you’re buying half a meter. When you buy a mag meter, for liquids, you buy a Coriolis meter, or you buy an inline ultrasonic, you’re buying a complete meter, the piping, the meter in itself, all together.
This one compressor station was looking overall at the cost and looked at this option and said, “Hey, that would be great.” It saved them, I think it was, $70,000 for that one…Actually, on that one, it was over $100,000 on the 16 inch. They saved over 100 grand by going with a clamp on quality measurement with a meter run.
Over in Texas, that was at a cryo-plant. Then, they were looking for balance between what was coming in and what was going out. That was on two 10 inch lines. They were considering an in-line ultrasonic as well.
Again, by no means is this any slant to an in-line ultrasonic meter. As we both discussed, high accuracy provides a lot of other capability that we cannot do by being on the outside of the pipe, by being able to calculate the flow profile and what have you. Especially for billing, that’s the way to go.
When it comes to the quality measurement and saving and cost reduction, the two 10 inch saved them about $70,000 a meter. That’s about 140 grand.
Weldon: That is enough to get anybody’s attention on a construction project. The key to that is, as I was thinking through what we talked about prior to the episode, one of the pieces that comes out in this is, in this particular case, if they were not installing a engineered and tested set of clamp on meters, there’s a fair chance they might not have installed a big multipath ultrasonic.
It might have been declared too expensive for the project. I have seen this happen over and over again. Where we really want the accuracy of a multipath ultrasonic, we can’t afford that, so we end up with an orifice plate sandwiched between a couple of flanges, typically on a pipe pointing up in the air with 1490s on the other side of it or something like that.
I think the takeaway from this is that this is the opportunity to get custody or near custody transfer grade measurement in places where the alternative prior might have been junk measurement, in my book.
Martin: To your point, even the near measurement, you’ve got something that is certified, that says it left the laboratory with this uncertainty. It’s a meter run that has all the given upstream and downstream piping. You’re not putting it in a poor location with an unknown, not knowing whether those two meters are balancing with each other or if there’s an error on one versus the other.
Weldon: What was the conversation like with the customer? Did they come to you asking for this, or did you all go to them and say, “Hey, here’s a proposal. Let’s talk about that.” How did you approach that with the customer?
Martin: We went to them with the idea. We were talking about the facility to see where we could help with measurement. It started off with clamp-on meters first that were at the facility, in different locations where they were doing lost and unaccounted for measurements, balance measurements, check measurement.
The other benefit of a clamp-on ultrasonic meter is the ability to move it around and actually check an orifice meter before and after a cleaning, check a custody transfer meter. It may not line up exactly with the custody meter, but if you see a big enough deviation, you’re going to know that “Hey, we might want to pull this meter and have it checked.”
That’s where it started. I would say, going back quite a few years back, before we released the new product, the FS230, we were doing that with our FUG and FUH, our gas and liquid hydrocarbon 1010 meters. We would fabricate the meter run. We’ve been doing this for quite a few years.
That’s where the conversation went. They were talking about, “How can I get this certified? Can I have it calibrated if I’m putting it in the line?” We were like, “The only way we’re going to be able to do that is by having it mounted on a meter run and sent to a laboratory to be tested, calibrated, and then put in.”
That’s where the discussion opened up. That’s where we looked at where we could go with different fabricators and have the meter run fabricated, have it sent out to CC, and dropped in the line. So far, these meters have been performing excellently.
The other outside benefit too is there isn’t going to be any maintenance where you’re going to have to pull any transducers because they’re external. That’s not going to get any buildup over time. There is that cost, though, that assurance that once they’re in-line, as long as they’re not having anything else going on inside that process, they should perform for many years with a…
[crosstalk]
Martin: …uncertainty and not having to be recalibrated.
Weldon: I know when we first started talking about this, I was sitting there and kind of wrapped my mind around the concept of shipping an engineered meter tube with clamp on ultrasonics to a testing lab. I kind of live in a hole. It’s not quite a well. It’s not quite that deep, but I live in a hole of custody transfer.
I’ve been out of the process plant world for, I guess if I was really going to admit to it, 15 years now. I really had not heard of the concept of shipping this engineered meter tube with clamp ons out for testing, but you say that’s not a new piece and you all have been doing it for quite a while, so I assume you have a pretty good size installed base of those types of meters.
Martin: We do, in different variations over the years. With the new 230, we have done…Like I said, it’s been these two facilities. We’ve got a few other customers that are interested in that.
It took us a while to get back up to speed again when we were transitioning from one product to the other to make sure that testing produced the same results. We expected that, but you don’t want to bring something to market and then find out that we don’t meet that required accuracy.
We’ve been doing that for quite a while. In some cases, what we’ll do is we have a very robust stainless steel mounting system that we’ll put on that one section of pipe. You bring up the transport part of it. Hey, the transducers are on the outside. I’m thinking, maybe the next question is, “Hey, are they going to move or shift?”
They’ll be on with a solid banding. In other cases, those mounts are actually welded onto the pipe. Then, the transducers will sit inside. There’s another mounting mechanism in there that keeps them in place.
Everything is all intact…
Weldon: Kept in place and protected.
Martin: Exactly. Even for vibration and bumps and stuff in the road during transport back and forth and delivery.
Weldon: It sounds like you all have got the system down for making this work. As you said, inside the process plant where we don’t necessarily need a cash register, where we’re trying to do lost unaccountable balancing, now, to me, I hear…
A lot of what I do as a consultant is to deal with customers when they’ve exhausted all their resources internally when trying to find their big balance problem. Maybe they’ve been running around at a quarter, half percent imbalance. They jump up on their system.
Maybe it’s a gathering system and they’ve been happy to stay under two percent. Now, all of a sudden, they’re five and everybody’s in a panic attack. A lot of time, that’s when the clamp ons come out. We bring the clamp ons out there.
We want to stick it on pieces of pipe that we’ve never seen before. We put it ahead of meters we’ve never looked at before and try to judge what’s going on. There can be value to that. If you start with an unknown, you just have a little bit more information once you get through with that process.
One thing that strikes me out of this is we’ve seen a few cases in the US where we install master meters or check meters against our custody transfer meter.
Up in Canada, they have implemented in their regulations some very sound procedures around allowing them to not even schedule calibrations as frequently or not even on schedule at all but by comparing two separate sets of measurements. It sure seems like there’s an opportunity there even if a company was intent on custody transfer ultrasonics or other custody transfer technology.
It certainly seems like an engineered meter tube with clamp on equipment upstream or downstream of that custody transfer meter could provide a very, very valuable tool on high value installations but at a cost much less than duplicating that multipath ultrasonic installation. Do you all have any installations like that in place currently?
Martin: We don’t. Weldon, that’s a great point. Like you mentioned, a lot of the custody transfer meters might have that check measurement upstream or downstream. That’s good.
Weldon: I’ll have to get my two percent commission on that.
Martin: Now I’m going to start looking for those opportunities. Again, you’re talking about another ultrasonic meter. That’s another class. You’re looking at expense, and a lot of this comes down to expense, right?
Having that clamp on meter on another section of pipe that has that known engineered area, upstream or downstream, would definitely give you that redundancy check and balance.
If you start to see any of the two deviations, typically that probably would end up being able to look a little bit further in there to see what the problem is, but again, at a lower cost. It seems like the theme here, it seems to be at your cost, but there is, “Hey, I’ll get the same accuracy, but I’ll save money,” but not being used as a billing meter.
Weldon: I think the key takeaway to all of that is overall if we improve our measurement, if we’re using it as check measurement, or if we’re using it inside the plant for process measurement, all of those things improve our operation overall.
That’s just like if we’re trying to monitor and reduce loss and unaccountability, having measurements with accuracies and uncertainties that look like the actual custody transfer pieces on either end, having the balancing measure in the center is important. That seems to be an excellent opportunity for this type of measurement.
We get the same type of uncertainty at a much lower cost, but still, that kind of meter could be used as a backup if another meter fails. That kind of information’s a lot better than no information at all. When you’re talking about a meter that has papers from a testing lab, that’s a good measurement in my book.
Martin: You’ve got my wheels rolling here, too, so now I’m thinking on that meter run, you’d have both of those meters calibrated at the same time.
Weldon: Actually, what I was thinking about is we just add a little spool to that original meter tube for the clamp-on tool.
Martin: Right, and they’re both being calibrated at the same time, which would be optimal, not having two separate or two individual meters being calibrated and then put in-line.
Weldon: I did a lot of work a couple of years back with a couple of companies up in Canada, and one of those very heavily relied on the concept of two independent meters on these large value custody transfer tubes.
Their entire back office measurement system was built around automated comparison of the values from those two meters. They watched it on an hourly basis and would flag if there were any discrepancies. If there weren’t discrepancies, they were all fat and happy, and didn’t bother looking at the meter.
Martin: That’s it.
Weldon: If either one of those started to diverge, then they knew, “Hey, we’ve got to go out there, and we’ve got to look at that.” It seems like this could be something that could be applied directly to that kind of thing here in the States, because our custody transfer here in the US already talk about that. I can’t quote chapter and verse, but it’s recognized.
Martin: It is. I was talking to you earlier…I teach a lot of classes in a lot of schools like at ISHM or at Appalachian Gas, the American School and so forth. One of things I try to teach when I’m talking about a clamp-on off the sonic meter is that the error doesn’t lie in the technology. It lies in how it’s applied.
I mentioned earlier how when you’re clamping on to a field installation and an existing section of piping, there’s a lot of unknowns. We don’t know, again, that cross section area is as accurate as we would like. The wall thickness all the way around, it could be non uniform and what have you.
When I look at a custody transfer, I look at a meter run that’s an engineered meter run, that’s where you’re putting your head into the pipe. Now I know everything that’s there, and now when I take this technology, I apply it to that section of pipe, and I’m conditioning the flow profile upstream, before the sensors, I’ve got everything I want now.
It’s proven, because then you bring that into the laboratory, and you can see without any calibration, putting in any correction factors, you’re within a very small uncertainty–better than if you were to clamp on 1/2 1 percent.
In some cases, some people, it could be 10 percent if they’re measuring it in a poor location. Once calibrated, you’ll even get it better than a tenth percent. A lot of times, people think, “Oh, it’s clamp on. That thing can’t be accurate. That’s not going to work.”
It comes down to understanding the technology and knowing how to apply it. If you can do those things, you can have great field installs and you can have very good custody quality measurement if you’ve got a good spool section designed for you with all the conditioning.
Weldon: I don’t know many people that would argue with better than a tenth of a percent, especially when it saves them a lot of money. Custody quality measurement is the key there. Let me loop around a couple things. I jotted down a couple notes.
One of which, when you talk about engineering a meter tube, shipping it off to CZ or one of the other testing labs for testing and characterization, is that typically going to be a single pair of clamp-on transducers? Is that meter tube going to have multiple sets of transducers on it?
Martin: On the 16 inch and the two 10 inches, they were dual paths, two sets of transducers. We can go up to four paths where we would have four pairs of transducers. We went with the dual path because we had the upstream sections, the two 10 diameter sections, and the conditioning.
When you have good conditioning and you have plenty of upstream piping, you shouldn’t see any deviation between path one, two, three, and four if you had all four paths. Everything should be pretty uniform.
Weldon: That’s what it’s really all about, what’s that flow profile look like, right? That’s all we’re getting from multiple transducers, multiple paths whether it’s 1 path or 20 paths. We’re just trying to compare them all and characterize them, right?
Martin: Exactly. The fact that we’re a diametral measurement where we’re cutting through the center of the pipe and an inline meter is chordal where it’s doing chords across the pipe. An inlying ultrasonic meter can plot out what that flow profile looks like and can see if there’s a glove or a block of wood stuck in the orifice up in the CPA plate, or conditioner, or upstream. They’ll see those.
On a clamp-on ultrasonic meter, we apply Reynolds number. We look at the median flowing in, the roughness on the inside of the pipe, all the other parameters to calculate that Reynolds number.
With multiple paths, we’ll be able to see if there’s any issues upstream as well inside of a conditioner. That’s why we’ve got the flexibility of multiple paths. If good conditioning, two paths is sufficient.
Weldon: Cool. Anything else you want to talk about before we go today? This has got the wheels turning in my mind. I hope it’s going to do the same for some of our listeners. Of course, I may get half a dozen emails the day this releases saying, “Hey, how dare you talk about something that doesn’t meet the exact spec in the standards?” Anything else?
Martin: No, that’s it. I appreciate you taking the time and inviting me to talk on this podcast.
Weldon: It’s great having you here. I certainly appreciate it, Martin. I’ll see you in CZ. What are we, two months away now?
Martin: Yeah.
Weldon: I mean ISHM, not CZ. ISHM is, what, second week in May?
Martin: Second week in May.
Weldon: Not too long. Be here before we know it. Thanks again for being on the podcast. Thanks for sharing some insight. We will have your LinkedIn profile information, your contact information in the show notes for our website if people want to reach out and get to you. If you want to leave your email address, you can do that also.
Martin: Great. Thank you, Weldon. I appreciate the time.
Weldon: Thanks again, Martin. Have a great day.
Martin: You too. Thank you.
Weldon: I’d like to thank each of you for listening. I hope that you found this episode both interesting and informative. If you did, please, share our podcast with your coworkers, your boss, and others in the industry. We will have a full transcript of this episode and Martin’s LinkedIn info on the show notes on our website, PipelinePodcastNetwork.com.
As always, if you have comments or questions about the episodes, suggestions for topics, or if you’d like to offer yourself up to the podcast mic as a guest, send me a message on LinkedIn or shoot me an email at weldon.wright@fpvprime.com.
Transcription by CastingWords